DIVISION 6. CONSERVATION, DEVELOPMENT, AND UTILIZATION OF STATE WATER RESOURCES 10000-12999›PART 3. CENTRAL VALLEY PROJECT 11100-11985
CHAPTER 2. Description of the Project 11200-11295
California Water Code · 2020-11 edition · updated 2026-10-04 · California
Sections in this part
- ARTICLE 1. General Provisions 11200-11201
- ARTICLE 2. Shasta Dam 11205-11209
- ARTICLE 3. Contra Costa Conduit 11215-11216
- ARTICLE 4. San Joaquin Pumping System 11220-11220
- ARTICLE 5. Friant Dam 11225-11227
- ARTICLE 6. Madera Canal 11230-11231
- ARTICLE 7. Friant-Kern Canal 11235-11237
- ARTICLE 8. Tehama-Colusa Conduit 11240-11242
- ARTICLE 9. Tehama-Butte Conduit 11250-11251
- ARTICLE 9.1. Hogan Dam 11252-11254
- ARTICLE 9.2. Los Banos Grandes Reservoir 11255-11257
- ARTICLE 9.3. Groundwater Storage 11258-11258
- ARTICLE 9.5. Feather River and Sacramento-San Joaquin Delta Diversion Projects 11260-11261
- ARTICLE 9.6. American River Development 11265-11265
- ARTICLE 9.7. North Bay Aqueduct 11270-11271
- ARTICLE 9.9. Black Butte Dam and Reservoir 11276-11276
- ARTICLE 10. Additional Units 11290-11290
- ARTICLE 11. Additional Plants and Works 11295-11295
Get a plain-English answer with a citation back to this text.
Ask AI about this code