Skip to content

Earlier editions: 2020-112018-112026-09

DIVISION 7. THE IMPROVEMENT ACT OF 1911 5000-6794›PART 3. PERFORMING THE WORK 5100-5954›CHAPTER 27. Construction of Sidewalks and Curbs 5870-5895.54›ARTICLE 3. Collection of Cost of Construction 5890-5895.1

§ 5895

California Streets and Highways Code · 2026-10 edition · updated 2026-10-04 · California

The legislative body shall have the power, in its discretion, to determine that the payment of such assessments of fifty dollars ($50) or more may be made in annual installments, in any event not to exceed 10, and that the payment of assessments so deferred shall bear interest on the unpaid balance at a rate to be determined by the legislative body, not to exceed 7 percent per annum. Said interest shall begin to run on the 31st day after the confirmation of the assessments by the legislative body. All such determinations may be expressed by resolution of the legislative body at any time prior to the confirmation of the assessments.

(Amended by Stats. 1968, Ch. 986.)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — California Streets and Highways Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.