Skip to content

GENERAL PROVISIONS›CHAPTER 5. Rubbish Dumps 4371-4376›ARTICLE 7. Timber Harvesting 4581-4592.5

§ 4585

California Public Resources Code · 2026-09 edition · updated 2026-09-27 · California

(a) Within one month after completion of the work described in the timber harvesting plan or nonindustrial timber harvest notice, excluding work for stocking, site preparation, or maintenance of drainage facilities and soil stabilization treatments on skid trails, roads, and landings after the plan period, a report shall be filed by the timber owner or the owner’s agent with the department that all work, except stocking, site preparation, or maintenance of drainage facilities and soil stabilization treatments, has been completed.

(b) If all of the work described in the plan has not been completed, a report may be filed annually with respect to a portion of the area covered by the plan which has been completed. The portion completed shall be adequately identified on a map submitted with the report.

(Amended (as added by Stats. 1989, Ch. 1290, Sec. 3) by Stats. 1993, Ch. 706, Sec. 1. Effective January 1, 1994.)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — California Public Resources Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.