DIVISION 18. MORRO BAY MANAGEMENT PLAN 28000-28007›CHAPTER 2.5. Revisions to the Coastal Zone Boundary 30150-30174›ARTICLE 7. Industrial Development 30260-30265.5
§ 30261
California Public Resources Code · 2026-09 edition · updated 2026-09-27 · California
Multicompany use of existing and new tanker facilities shall be encouraged to the maximum extent feasible and legally permissible, except where to do so would result in increased tanker operations and associated onshore development incompatible with the land use and environmental goals for the area. New tanker terminals outside of existing terminal areas shall be situated as to avoid risk to environmentally sensitive areas and shall use a monobuoy system, unless an alternative type of system can be shown to be environmentally preferable for a specific site. Tanker facilities shall be designed to (1) minimize the total volume of oil spilled, (2) minimize the risk of collision from movement of other vessels, (3) have ready access to the most effective feasible containment and recovery equipment for oilspills, and (4) have onshore deballasting facilities to receive any fouled ballast water from tankers where operationally or legally required.
(Amended by Stats. 1987, Ch. 182, Sec. 1.)
Get a plain-English answer with a citation back to this text.
Ask AI about this code