§ 25330

California Public Resources Code · 2026-09 edition · updated 2026-09-27 · California

For purposes of this chapter, the following terms have the following meanings:

(a) “Feasible” has the same meaning as in Section 21061.1.

(b) “High-voltage electric transmission line” means an electric transmission line with an operating capacity of at least 200 kilovolts, or that is under the operational control of the California Independent System Operator.

(c) “Transmission corridor zone” means the geographic area necessary to accommodate the construction and operation of one or more high-voltage electric transmission lines. A transmission corridor zone shall not be more than 1,500 feet in width unless required to accommodate existing land uses and land uses identified in local general or specific plans, or to avoid environmental constraints or mitigate potential environmental impacts.

(Added by Stats. 2006, Ch. 638, Sec. 2. Effective January 1, 2007.)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — California Public Resources Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.