Skip to content

DIVISION 5. SAFETY IN EMPLOYMENT 6300-9104›PART 3. SAFETY ON BUILDINGS 7100-7384›CHAPTER 1. Buildings Under Construction or Repair 7100-7267›ARTICLE 4. Structural Steel Framed Buildings 7250-7267

§ 7261

California Labor Code · 2020-11 edition · updated 2026-10-04 · California

When gathering and stacking temporary floor plank on a lower floor, in preparation for transferring such plank for use on an upper working floor, the steel erector’s personnel shall remove such plank successively, working toward the last panel of such floor, so that the work is always being done from the planked floor.

(Added by Stats. 1970, Ch. 1498.)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — California Labor Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.