§ 7260

California Labor Code · 2020-11 edition · updated 2026-10-04 · California

Prior to removal of temporary floor plank, employees shall be instructed by assigned supervision the steps to be taken to perform the work safely and in proper sequence.

(Added by Stats. 1970, Ch. 1498.)