Skip to content

DIVISION 5. SAFETY IN EMPLOYMENT 6300-9104›PART 3. SAFETY ON BUILDINGS 7100-7384›CHAPTER 1. Buildings Under Construction or Repair 7100-7267›ARTICLE 4. Structural Steel Framed Buildings 7250-7267

§ 7263

California Labor Code · 2018-11 edition · updated 2026-10-04 · California

The sequence of erection, bolting, temporary guying, riveting and welding shall be such as to maintain the stability of the structural frame at all times during construction. This applies to the dead weight of the structure, plus weight and working reactions of all construction equipment placed thereon plus any external forces that may be applied.

(Added by Stats. 1970, Ch. 1498.)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — California Labor Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.