Skip to content

TITLE 7.97. RECYCLING, RESOURCE RECOVERY, AND LITTER PREVENTION 68055-68055.9›CHAPTER 4.2. Appellate Court Facilities 69202-69206›ARTICLE 7.1. Superior Court Design-Build Projects 70398-70398.7

§ 70398.6

California Government Code · 2026-09 edition · updated 2026-09-27 · California

(a) If the Judicial Council elects to award a project pursuant to this article, retention proceeds withheld by the Judicial Council from the design-build entity shall not exceed 5 percent if a performance and payment bond, issued by an admitted surety insurer, is required in the solicitation of bids.

(b) In a contract between the design-build entity and a subcontractor, and in a contract between a subcontractor and a subcontractor thereunder, the percentage of the retention proceeds withheld may not exceed the percentage specified in the contract between the Judicial Council and the design-build entity. If the design-build entity provides written notice to a subcontractor that is not a member of the design-build entity, prior to or at the time the bid is requested, that a bond may be required and the subcontractor subsequently is unable or refuses to furnish a bond to the design-build entity, then the design-build entity may withhold retention proceeds in excess of the percentage specified in the contract between the Judicial Council and the design-build entity from any payment made by the design-build entity to the subcontractor.

(Added by Stats. 2021, Ch. 79, Sec. 30. (AB 143) Effective July 16, 2021.)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — California Government Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.