Earlier editions: 2026-07
Buellton Municipal Code Ch. 13.28 Subdivisions
Buellton Municipal Code · 2026-10 edition · updated 2026-10-04 · Buellton
Cite as: Buellton Municipal Code Chapter 13.28 · Text as of 2026-10-04
§ 13.28.010. Application—Requirements.¶
A person desiring to provide a water system within a tract of land which he or she proposes to subdivide, shall make written application therefor. The application shall state the number of the tract, the name of the subdivision and its location. It shall be accompanied by a copy of the tentative map, and of the plans, profiles and specifications for the street work, sanitary sewers, storm drains and other underground utilities.
(Prior code § 14.40.001; Ord. 94-1 § 1, 1994)
§ 13.28.020. Investigation.¶
Upon receiving the application, the public works director shall make an investigation and survey of the proposed subdivision and shall report his or her findings to the council, including a recommendation as to the facilities required and the estimated cost of the proposed water system therefor. To assist the public works director in making the investigation and report, the council may engage the services of a consulting engineer. The size, type and quality of materials shall be in accordance with the city's standards and specifications in effect at the time of application.
(Prior code § 14.40.002; Ord. 94-1 § 1, 1994)
§ 13.28.030. Specifications and construction.¶
Location of the lines shall be specified by the city. The actual construction will be done at the expense of and by the subdivider and inspected by the public works director or authorized representative. Plans and engineering costs will be the responsibility of the property owner. Fire hydrants shall be located at locations designated by the city.
(Prior code § 14.40.003; Ord. 94-1 § 1, 1994)
§ 13.28.040. Property of city.¶
All water main, water service, and fire hydrant facilities installed by a subdivider shall become the property of the city and shall be conveyed to the city by a property instrument in writing at the time the facilities are completed and accepted by the city.
(Prior code § 14.40.004; Ord. 94-1 § 1, 1994)
§ 13.28.050. Service connections.¶
The subdivider shall, at his or her cost, provide and install the service connection to each house or proposed house in the tract, including the corporation stop, meter valve, and meter box but not including the meter. No deposit will be required.
(Prior code § 14.40.005; Ord. 94-1 § 1, 1994)
§ 13.28.060. Costs and expenses.¶
All costs and expenses incurred by the city under this chapter, including the cost of investigation, inspection, legal and consulting engineer's services, shall be paid to the city by the subdivider prior to final approval and acceptance of the facilities by the city.
(Prior code § 14.40.006; Ord. 94-1 § 1, 1994)
§ 13.28.070. Further requirements.¶
In granting an application, the council may make whatever further requirements as may appear to it to be necessary.
(Prior code § 14.40.007; Ord. 94-1 § 1, 1994)
Get a plain-English answer with a citation back to this text.
Ask AI about this code