Skip to content

Chapter 7 — BUILDINGS›Article IV — CONSTRUCTION REGULATIONS›Division 10 — GREEN BUILDING STANDARDS CODE

§ 4.106

Belmont Municipal Code · 2026-09 edition · updated 2026-10-02 · Belmont

4.106.1 - 4.106.3 {text unchanged}

4.106.4 Electric vehicle (EV) charging.

4.106.4.1 New one- and two-family dwellings and town-houses with attached private garages.

4.106.4.2 New multifamily dwellings with residential parking facilities.

4.106.4.2.1 New Construction - Affordable Housing.

4.106.4.2.2 New Construction - All Other.

4.106.4.2.3 Existing Buildings.

4.106.4.3 Electric vehicle charging stations (EVCS).

4.106.4.3.1 Location. EVCS shall comply with at least one of the following options:

4.106.4.3.2 Dimensions.

4.106.4.4 Direct current fast charging stations.

4.106.5 All-electric buildings.

4.106.5.1.

4.106.5.2 Requirements for Combustion Equipment. Where combustion equipment is allowed per

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Belmont Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.