13.4 REVIEW PROCEDURE

Belmont Zoning Code · 2026-06 edition · updated 2026-07-07 · Belmont

  • 13.4.1 Reviewing Authority. The Design Review entitlement reviewing authority for projects within the scope of Section 13.2 is specified in Table 13.4.

Table 13.4 - Design Review (DR) Authority Thresholds.

Table 13.4 - Design Review (DR) Authority Thresholds.
Project Characteristics Reviewing
Authority

Replacement, relocation, and addition of windows, doors, awnings,
and other minor modifications not adding floor area.

Repainting of building exteriors, and modifications to previously
approved exterior colors.

Modifications to landscaping and exterior lighting plans.
• New Rooftop equipment and screens visible from off-site.
• Modifications to existing parking lots (reconfiguration or
expansion), not associated with expansion of the primary
commercial, multi-family or mixed-use building on site.
Community
Development
Department
(CDD)

City of Belmont Zoning Ordinance

13-3

  • Reviewing

  • Project Characteristics Authority

  • • Approval of signs under Section 23.11.3 in conjunction with replacement, relocation, or addition of windows, doors, awnings, and minor modification projects not adding floor area, which do not constitute a substantial exterior remodel.

  • • Additions to principal commercial, multi-family residential and mixed-use buildings.

  • • New or modified detached accessory structures on a developed property.

  • • Modifications to existing parking lots (reconfiguration or expansion) associated with ZA level entitlement. Zoning

  • • Modifications to circulation and parking and loading facilities for Administrator pedestrians, bicycles and motor vehicles on a previously approved (ZA)

  • development.

  • • Modifications or amendments to a Tree Removal Permit (TRP) on a previously approved development; provided however, that the findings for approval of the TRP are made in the affirmative.

  • • DR with other ZA level entitlements • New principal and accessory buildings. • Modifications to existing parking lots (reconfiguration or expansion) associated with a PC level entitlement. Planning

  • Commission

  • • Approval of signs under Section 23.11.3 to be located on new (PC)

  • buildings, building additions, or buildings undergoing substantial exterior remodels.

  • • DR with other PC level entitlements

13.4.2 ZONING ADMINISTRATOR PROCEDURE.

  • (a) Project Notice. The Zoning Administrator gives notice of intent to take action in the manner described in Section 10.1.3. The notice includes a general description of the project and its location in text or diagram, the proposed environmental determination and action, and a statement that the Zoning Administrator will take action on the project based on the written record unless an in-person meeting is requested in writing within 10 days of the project notice date by a property owner within 300 feet of the project site.

  • (b) Meetings. If requested, the Zoning Administrator gives notice of in-person meetings in the same manner as project notice.

  • (c) Project Determination. The Zoning Administrator makes a Design Review entitlement determination after the project notice period expires, or if a meeting is requested, after the meeting.

City of Belmont Zoning Ordinance

13-4

  • (d) Referral. At any point before making a determination, the Zoning Administrator may refer a Design Review entitlement with a recommendation for determination to the Planning Commission.

  • 13.4.3 PLANNING COMMISSION PROCEDURE. The Zoning Administrator gives notice that the Planning Commission will consider the Design Review entitlement at a meeting. The notice is given in the manner described in Section 10.1.3 and contains the information described in Section 10.1.5(a) for the project and meeting.

  • 13.4.4 APPEALS.[3]

    • (a) Design Review entitlement decisions are governed by Section 10.11 except as follows.

    • (b) For CDD determinations, the applicant may appeal a Design Review determination to the Planning Commission. A decision on review by the Planning Commission is final unless appealed by the applicant.

    • (c) For ZA determinations, the applicant and a property owner within 300 feet of the project site may appeal the determination to the Planning Commission. The Planning Commission may either affirm the underlying determination or forward the appeal to the City Council with a recommendation to approve, approve with conditions, or deny the project.

    • (d) The City Council finds that the Design Review determinations ordinarily made at the CDD level shown in Table 13.4 do not have the potential to substantially or significantly adversely affect the property rights of other property owners, and that Design Review determinations at the ZA level shown in Table 13.4 do not have the potential to substantially or significantly adversely affect the property rights of other property owners beyond neighboring property owners. The City Manager, in consultation with the City Attorney, may expand the scope of notice and opportunity to appeal from CDD or ZA level determinations if necessary due to facts peculiar to the proposed project to provide due process.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Belmont Zoning Code
Belmont Zoning Code
  1. 4.3.1 PERMITTED USES[21]
  2. 4.5.1 PERMITED USES[35]
  3. 4.7.10 HRO-1 ZONING DISTRICT STANDARDS
  4. 4.7.12 HRO-3 ZONING DISTRICT STANDARDS[66]
  5. 5.5.1 PERMITTED USES
  6. 5.6.1 PERMITTED USES
  7. 5.7.2 CONDITIONAL USES[75]
  8. 5.7.3 SITE AREA, DIMENSION AND COVERAGE LIMITATIONS
  9. 6.2.2 PERMITTED USES
  10. 8.2.3.11 Landscaping for Parking Structures .
  11. 8.2.4 LOCATION OF REQUIRED SPACES
  12. 8.3.5 ALTERNATIVE COMPLIANCE.
  13. 8.4 BICYCLE PARKING
  14. 8.5 LOADING REQUIREMENTS
  15. 8.2.3.11 Landscaping for Parking Structures .
  16. 8.2.4 LOCATION OF REQUIRED SPACES
  17. 8.3.5 ALTERNATIVE COMPLIANCE.
  18. 8.4 BICYCLE PARKING
  19. 8.5.7 LOCATION.
  20. 9.6.3 ALTERATIONS AND ADDITIONS TO NON-CONFORMING STRUCTURES[9]
  21. 10.4.4 Fees.
  22. 10.5 ENTITLEMENT REVIEW
  23. 10.7.5 Conditions of Approval .
  24. 10.8.2 Application Requirements .
  25. 10.8.3 Approval Authority .
  26. 10.10 DISCONTINUANCE OF USE PERMIT, VARIANCE, OR NONCONFORMING…
  27. 10.11.2 Reviewing body .
  28. 10.11.4 Notice of Appeal
  29. 10.11.5 Consideration of Appeal
  30. 12.12 ADMINISTRATIVE APPROVALS OF AMENDMENTS TO DETAILED DEVEL…
  31. 13.2.2 REQUEST FOR DESIGN REVIEW
  32. 13.3.1 PROJECT REQUIREMENTS[2]
  33. 13.4 REVIEW PROCEDURE
  34. 13.5 STANDARDS FOR APPROVAL
  35. 13.6.1 BUILDING DESIGN
  36. 19.1 JUSTIFICATION
  37. 19.4 LOCATIONAL AND SITE STANDARDS
  38. 19.5 NOTICE/ADDITIONAL REQUIREMENTS
  39. 21.3 S-2 EMERGENCY SHELTER COMBINING DISTRICT
  40. 21.4.1 Cannabis Uses
  41. 21.4.2 S-3 Cannabis Retail and Distribution Overlay District
  42. 23.3 EXEMPT AND PROHIBITED SIGNS
  43. 23.5.2 Changeable Copy .
  44. 23.5.5 Materials and Mounting Requirement
  45. 23.5.7 Non-Conforming Signs
  46. 23.6.3 Additional Sign Allowances for Nonresidential Propertie…
  47. 23.7.3 Standards for Detached Single Family, Duplex Units, and…
  48. 23.7.4 Additional Allowance for Master Unit of Multi-family an…
  49. 23.8 STANDARDS FOR SPECIFIC SIGN TYPES
  50. 23.11.5 Interpretations and Appeals
  51. 26.4 APPLICATION REQUIREMENTS.
  52. 26.5 DENSITY BONUS.
  53. 26.6 INCENTIVES.

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.