Skip to content

Earlier editions: 2026-09

Title 18 — GRADING, EROSION AND SEDIMENT CONTROL

Banning Municipal Code Ch. 18.21 Completion of Work

Banning Municipal Code · 2026-10 edition · updated 2026-10-04 · Banning

Cite as: Banning Municipal Code Chapter 18.21 · Text as of 2026-10-04

18.21.020 - Final reports.

Upon completion of the rough grading work and at final completion of the work, the city engineer may require the written approvals, reports, plans and supplements specified in Subarticle 8 of the grading manual.

(Ord. No. 1388, § 4, 7-14-09)

Exceptions & meaning →

18.21.040 - Notification of completion.

The permittee or his agent shall notify the city engineer when the grading operation is ready for final inspection. Final approval shall not be given until all work, including installation of all drainage facilities and their protective devices, and all erosion and sediment control measures, including landscaping and its irrigation system, have been completed in accordance with the approved grading plan, and the required reports have been submitted. Where landscape planting for erosion and sediment control has been installed, final clearance, i.e., release of security deposits, shall not be granted until the plantings have become established. The establishment of such erosion and sediment control plantings shall be certified by a licensed landscape architect and approved by the city engineer.

(Ord. No. 1388, § 4, 7-14-09)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Banning Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.