Chapter 78 — UTILITIES›Article V — INDUSTRIAL WASTE
Division 3 — TREATMENT PLANTS OR FACILITIES
Azusa Municipal Code · 2026-09 edition · updated 2026-10-02 · Azusa
Sec. 78-301. - Required.¶
Sec. 78-302. - Exemptions.¶
Sec. 78-303. - Sand or grease interceptors required.¶
Sec. 78-304. - Neutralizing chambers.¶
Sec. 78-305. - Accessibility.¶
Sec. 78-306. - Additions.¶
Sec. 78-307. - Maintenance.¶
Sec. 78-308. - Test manholes or structures.¶
Sec. 78-309. - Periodic tests.¶
Sec. 78-310. - Right of entry.¶
Sec. 78-311. - Inspections.¶
Sec. 78-312. - Inspectors to comply with owners' safety regulations.¶
Sec. 78-313. - Design conformance required.¶
Sec. 78-314. - Minimum standards for design.¶
Sec. 78-315. - Design conformance to effluent standards.¶
Sec. 78-316. - Materials.¶
Sec. 78-317. - Substructures.¶
Sec. 78-318. - Soil conditions.¶
Sec. 78-319. - Benchmarks.¶
Sec. 78-320. - Construction conformance.¶
Sec. 78-321. - Excavations.¶
Sec. 78-322. - Stabilization of wet or soft ground.¶
Sec. 78-323. - High groundwater.¶
Sec. 78-324. - Disposal of excavated material.¶
Sec. 78-325. - Water test.¶
Sec. 78-326. - Testing in sections.¶
Sec. 78-327. - Test of cement joints.¶
Sec. 78-328. - Effect of failure to withstand tests.¶
Sec. 78-329. - Construction test.¶
Sec. 78-330. - Time limit.¶
Sec. 78-331. - Inspection required.¶
Sec. 78-332. - Inspection by city engineer; deposit; notice.¶
Sec. 78-333. - Readiness of work for inspection.¶
Sec. 78-334. - Removal of obstructions prior to inspection.¶
Sec. 78-335. - Correction of defective work.¶
Sec. 78-336. - Permittee responsibilities for tests.¶
Sec. 78-337. - Inspection of forms.¶
Sec. 78-338. - Inspection certificate.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code