Chapter 20.48 — SOIL INVESTIGATION
Stanislaus County Planning Code · edición 2026-07 · actualizado 2026-07-25 · Stanislaus County
§ 20.48.010. Required on final map. ¶
Esta sección aún no está traducida y se muestra en inglés.
If a required preliminary soil report indicates the presence of critically expansive soils or other soil problems which, if not corrected, would lead to structural defects, the subdivider shall provide for and submit the findings of a soil investigation of each lot in the subdivision. The investigation shall be prepared by a registered civil engineer and shall include a recommendation for corrective action to prevent structural damage to buildings proposed to be constructed on the expansive or otherwise problem soils, and this shall be noted on the final map.
(Prior code §9-39; Ord. NS 1061 §2, 1981; Ord. CS 179 §1, 1986)
§ 20.48.020. Correction required for building permit issuance. ¶
Esta sección aún no está traducida y se muestra en inglés.
As a condition to the granting of building permits where expansive soils are found, the building inspector shall require the corrective measures recommended by the registered civil engineer making the soil report. The soil report shall be kept on file at the department of environmental resources for public inspection. This shall be noted on the final map. (Prior code §9-39; Ord. NS 1061 §2, 1981; Ord. CS 179 §1, 1986)
Obtén una respuesta en español sencillo con una cita a este texto.
Pregúntale a la IA sobre este código▸ Contenido — Stanislaus County Planning Code
-
▸ Title 20 — Subdivisions
Overview- Chapter 20.04 — GENERAL PROVISIONS
- Chapter 20.08 — DEFINITIONS
- Chapter 20.12 — TENTATIVE MAPS
- Chapter 20.13 — VESTING TENTATIVE MAPS
- Chapter 20.14 — LOT LINE ADJUSTMENTS
- Chapter 20.16 — PARCEL MAPS
- Chapter 20.17 — FEES FOR CONSTRUCTION OF BRIDGES AND MAJOR THO…
- Chapter 20.20 — CONDOMINIUMS, COMMUNITY APARTMENTS AND STOCK C…
- Chapter 20.24 — MOBILE HOME PARK CONVERSION
- Chapter 20.28 — RESUBDIVISION
- Chapter 20.32 — REVERSION TO ACREAGE
- Chapter 20.36 — EXCLUSIONS
- Chapter 20.40 — FINAL MAPS
- Chapter 20.44 — CERTIFICATES
- Chapter 20.48 — SOIL INVESTIGATION
- Chapter 20.52 — DESIGN STANDARDS
- Chapter 20.56 — IMPROVEMENTS
- Chapter 20.64 — EXCEPTIONS
- Chapter 20.68 — APPEALS
- Chapter 20.72 — RESUBMITTAL TIME LIMIT
- Chapter 20.76 — REVOCATION AND COMPLIANCE
- Chapter 20.80 — ENFORCEMENT
- Chapter 20.84 — CERTIFICATE OF COMPLIANCE
- Title 22 — Development Agreements