Title 4 — SUPPLEMENTAL PROVISIONS SEC. 43.15.25. LIBERAL CONSTRUCTION.›Chapter 99 — PUBLIC POWER IN NEW CITY DEVELOPMENTS
SEC. 99.3. ELECTRIC SERVICE TO CITY DEPARTMENTS AND FACILITIES.
San Francisco Administrative Code · edición 2025 · actualizado 2026-07-08 · San Francisco
Esta sección aún no está traducida y se muestra en inglés.
(a) All City departments, including departments located in or on non-City-owned facilities and properties, shall receive electric service from the PUC unless the PUC determines that such service is not feasible or the City's lease or contract does not permit such service. All tenants in City facilities or on City property shall receive electric service from the PUC unless the PUC determines that such service is not feasible. Any lease, or sub
lease for a City facility or City property shall include standard language identifying the PUC as the electric provider unless the PUC determines that such service is not feasible.
(b) All City departments shall work with the PUC to plan for, design, and construct electric infrastructure to determine the most beneficial means of constructing and funding infrastructure needed for connection to the electric grid to maximize the long-term benefits and minimize costs to the City.
(Added by Ord. 247-14, File No. 140704, App. 12/17/2014, Eff. 1/16/2015)