Title 16 — SUBDIVISIONS[[1]]›Chapter 16.16 — IMPROVEMENT AGREEMENTS AND SECURITY
§ 16.17
Irwindale Planning Code · edición 2026-07 · actualizado 2026-07-25 · Irwindale
16.17.010 - Preliminary soils report required. ¶
Esta sección aún no está traducida y se muestra en inglés.
A preliminary soils report based upon adequate test borings and prepared by a registered civil engineer shall be required for every subdivision. The preliminary soils report shall be submitted with the tentative map application.
(Ord. No. 698, § 4, 10-14-15)
16.17.020 - Form of report.
A preliminary soils report may be divided into two parts:
A.
Soils Reconnaissance. The soil reconnaissance shall include a complete description of the site based on a field investigation of soils matters. The soils matters reviewed shall include stability, erosion, settlement, feasibility of construction of the proposed improvements, description of soils related hazards and problems and proposed methods of eliminating or reducing these hazards and problems; and
B.
Soils Investigation and Report. This investigation and report shall include field investigation and laboratory tests with detailed information and recommendations relative to all aspects of grading, filling and other earthwork, foundation design, pavement design and subsurface drainage. The report shall also recommend any required corrective action for the purpose of preventing structural damages to the subdivision improvements and the structures to be constructed on the lots. The report shall also recommend any special precautions required for erosion control, and the prevention of sedimentation or damage to off-site property. If the preliminary soils report indicates the presence of critically expansive soils or other soils
problems which, if not corrected, would lead to structural defects, or environmental impacts, a subsequent soils investigation of each parcel in the subdivision may be required and submitted to the city engineer before approval of a final map.
(Ord. No. 698, § 4, 10-14-15)
16.17.030 - Preliminary soils report waiver. ¶
Esta sección aún no está traducida y se muestra en inglés.
The preliminary soils report may be waived if the city engineer determines that existing available information on the qualities of the soils of the subdivision makes no preliminary analysis necessary.
(Ord. No. 698, § 4, 10-14-15)
16.17.040 - Final soils report.
A final soils report prepared by a registered civil engineer shall be required where a preliminary soils report was required, unless the final report is waived by the city engineer.
A.
Two copies of the final soils investigation and report shall be filed with the improvement plans.
B.
The report shall contain sufficient information to ensure compliance with all recommendations of the preliminary soils report and the specifications for the project.
C.
The report shall also contain information relative to soils conditions encountered which differed from that described in the preliminary soils reports, along with any corrections, additions or modifications not shown on the approved plans.
(Ord. No. 698, § 4, 10-14-15)
16.17.050 - Geologic investigation and report.
If the city engineer determines that conditions warrant, a geologic investigation and report may also be required.
(Ord. No. 698, § 4, 10-14-15)
Obtén una respuesta en español sencillo con una cita a este texto.
Pregúntale a la IA sobre este código