Skip to content

Title 10Chapter 18 — DEVELOPMENT IMPACT FEES

Article 6

Hercules Planning Code · edición 2026-07 · actualizado 2026-07-25 · Hercules

Esta sección aún no está traducida y se muestra en inglés.

Transportation Facilities Impact Fees

Sec. 10-18.601. Intent and Purpose.

Esta sección aún no está traducida y se muestra en inglés.

The City Council of the City of Hercules finds and declares that:

  • (a) As a result of increasing regional growth, significant residential, commercial and industrial development is expected to occur within the City.

  • (b) The general plan specifies the permitted uses of land within the City, places limits on the intensity and density of such use, and includes policies to improve the safety of roadway facilities and to provide for pedestrian and bicycle infrastructure. The City Council has examined the relationship between the land uses and densities permitted under the general plan and the rate and amount of actual development of property within the City. Based upon this examination, the City Council has identified trends in growth and development which enable the council to project, with substantial certainty, the magnitude and extent of future development based upon the City's general plan.

  • (c) Based upon projected growth and development permitted under the general plan, a substantial amount of residential, commercial and industrial development will occur in the City before the City is fully built out.

  • (d) New development in Hercules will increase the demand for all modes of travel (including walking, biking, transit, automobile and truck/goods movement), and thus will increase the need for improvement to transportation facilities, including but not limited to vehicular, transit, bicycle, and pedestrian infrastructure and improvements. This anticipated development cumulatively will generate a substantial increase over existing levels of vehicular traffic, and transit, bicycle and pedestrian travel. This increase in multi-modal travel will result in traffic volumes which exceed the capacity of the existing City-wide circulation system to provide acceptable levels of service and safe transportation facilities. New development within the City will thus create an additional burden on the existing transportation facilities.

  • (e) If additional traffic-related as well as transit, bicycle, and pedestrian transportation facilities are not added as development occurs, the existing transportation facilities will not be adequate to serve the community consistent with the general plan. This could result in adverse impacts, such unacceptable levels of congestion on streets and at intersections, traffic accidents, air pollution, noise and restricted access for emergency vehicles. This would lead to a deterioration of the level of service for vehicles and deterioration of other transportation facilities, such as transit, bicycle and pedestrian facilities, which the residents, employees, and property owners in Hercules now enjoy.

  • (f) To prevent these undesirable consequences, the capacity of the City-wide transportation facilities must be built at a rate which will accommodate the expected growth in the City.

  • (g) Although the traffic volume generated by an individual development project may not be, in and of itself, sufficient to overload the existing City-wide transportation facilities, the cumulative impact of all new development, including development currently approved or submitted for approval, will result in unacceptable levels of traffic congestion.

  • (h) It is the policy of the City that new development pay for the cost of improvements to the

Downloaded from https://ecode360.com/HE4476 on 2026-07-06

City of Hercules, CA

Sec. 10-18.601

HERCULES CODE

Sec. 10-18.601

City-wide circulation system which are necessary to accommodate the traffic volumes generated by new development. In the absence of this Article imposing a traffic facilities fee, existing and future sources of revenue will be inadequate to fund a substantial portion of the transportation facilities which are necessary to avoid unacceptable levels of congestion and the related adverse impacts.

  • (i) All types of urban development require and use transportation facilities. The City Council also has examined the rates at which different land uses generate traffic. The City Council, in evaluating these traffic generation rates, has taken into consideration, among other things, other traffic-related studies and reports prepared by or on behalf of the City. The City Council finds that these traffic generation rates represent a reasonable estimate of the actual impact on the City's circulation system.

  • (j) A fair and equitable method of securing some of the revenues necessary to construct the required improvements to the transportation facilities is to impose a transportation impact fee based on the extent to which new development generates additional traffic volumes and impacts to the transportation facilities.

  • (k) The 2019 Hercules Transportation Impact Fee Nexus Study specifically identifies transportation facility improvements which are necessary to accommodate future growth. These improvements are and will be incorporated in the City's Capital Improvement Program (CIP).

  • (l) The circulation system improvements that will be constructed with funds generated pursuant to the article will significantly benefit the contributor in that the adverse impacts, such as noise, air pollution, delay, accidents, increased fuel consumption, harm to the local economy, and inconveniences caused by traffic congestion will be substantially mitigated. Persons who undertake new development in the City are benefited by a desirable community and the City's reputation for providing, and ability to provide, an adequate transportation system.

  • (m) Pursuant to Government Code Section 66001, and based upon the 2019 Hercules Transportation Impact Fee Nexus Study and the terms of this Article, the Council finds that:

    • (1) The purpose of the fee imposed pursuant to this Article is to provide adequate transportation improvements to serve new development within the City.
  • (2) The improvements for which the fee will be used are identified in the Hercules Transportation Impact Fee Nexus Study, as approved in 2019, summarized below and supported by the Hercules General Plan, to be contained in the City's Capital Improvements Program (CIP).

    1. Signalize intersection of San Pablo and Tsushima 
    
    2. Reconfigure Sycamore Ave cross section from Willow to San Pablo 
    
    3. San Pablo/Jon Muir Parkway to I-80 ramp expansion 
    
    4. Intersection improvements at Willow and Sycamore 
    
    5. Add 3rd NB through lane to San Pablo Ave at Sycamore 
    
    6. Install pedestrian activated signal at Market Hall crosswalk
    

Downloaded from https://ecode360.com/HE4476 on 2026-07-06

City of Hercules, CA

Sec. 10-18.601

LAND USE

Sec. 10-18.601

==> picture [377 x 300] intentionally omitted <==

----- Start of picture text -----
7. Upgrade or add ADA curb ramps
8 Hercules Creekside trail from Alfred Noble to Sycamore
9. Multi-use path at Market Hall
10. Pedestrian connection along Palm between Sycamore and Willow
11. Bay Trail gap closure and lighting
12. Expand bicycle network
13. Add sidewalk along Willow Ave to Hercules Transit Center
14. Improve pedestrian connections to Hercules Transit Center from Creekside
Shopping Center along Sycamore to Willow
15. Extend sidewalk connections to Rodeo
16. Complete bicycle facilities between Mariner's Pointe and HTC
17. Add lighting to Refugio Valley Trail
18. Remove crosswalk at north leg of San Pablo and Sycamore
19. Provide bus shelters along San Pablo
20. Parking for Intermodal Transit Center
21. Complete Intermodal Transit Center/Rail Station (RITC)
----- End of picture text -----

  • (3) All types of urban development require and use the transportation system.

  • (4) The amount of the fee imposed pursuant to this Article shall bear a fair and reasonable relationship to each development's burden on and benefit from the City-wide circulation system improvements to be funded by the traffic impact fee, and shall be based on the following considerations:

    • A. New development will pay only for those improvements which serve new development or which are necessary to reduce impacts to the transportation facilities which would otherwise be created by new development. The cost of improvements needed to alleviate existing transportation system deficiencies are not included in this fee.

    • B. Each type of development shall contribute to the needed improvements in proportion to the use of improvements by that type of development, based upon traffic generation and trip length characteristics of various land uses to those same rates for a typical single-family residential unit (referred to as a DUE—dwelling unit equivalent) for each type of land use category.

  • (n) Periodic review, and possible revision, of the resolution adopted by the City Council under this Article will allow for the adjustment of the fee to ensure that the fee remains a fair and equitable method for the distribution of costs to construct circulation system improvements necessary to accommodate traffic volumes generated by development.

  • (o) The 2019 Hercules Transportation Impact Fee Nexus Study prepared by DKS for the City of Hercules, a copy of which is on file with the City Clerk, and future Council-approved amendments to it, are approved, incorporated herein by reference and provide the technical

Downloaded from https://ecode360.com/HE4476 on 2026-07-06

City of Hercules, CA

Sec. 10-18.601

HERCULES CODE

Sec. 10-18.602

information on which the fee imposed pursuant to this Article is based. (Ord. 364 § 2 (part), 2001; Ord. 518 § 1 (Exh. A (part)), 2019)

Sec. 10-18.602. Definitions.

Esta sección aún no está traducida y se muestra en inglés.

In this Article:

  • (a)

    • "Director" means the City Manager or the City Manager's designee;
  • (b) "2019 Hercules Transportation Impact Fee Nexus Study" is the report of that title dated March 12, 2019, prepared by DKS for the City of Hercules, and future additions and amendments or supplements to or replacements of that report, all of which are incorporated in this Article.

  • (c) "Permit" means a building or use permit authorizing the development of new floor area or a change from one (1) land use category to another.

  • (d) "Floor area" means the gross floor area of a building or, if a building contains separate uses for which the fee is payable, the floor area of each of those uses. It is determined by calculating the total combined floor area within the building's exterior walls or, in the case of a building containing more than one (1) use, the area within the walls containing each separate use. Floor area includes the area of an addition where floor area is increased. Parking areas and exterior walkways are not included in this calculation.

  • (e) "Improvements" are the transportation facility improvements in the City which are identified in the 2019 Hercules Transportation Impact Fee Nexus Study, the Hercules General Plan, and the Capital Improvements Program (CIP). They include improvements to intersections, roadways, freeway ramps, traffic signals, pedestrian facilities, bicycle facilities, and transit facilities.

  • (f) Land uses referred to in this Article and in the resolution establishing fees are defined as follows:

    • (1) "Single-family dwelling" includes one (1) detached single-family dwelling unit on a single parcel.

    • (2) "Multifamily dwelling" means all attached dwellings such as apartments, town houses, condominiums, duplexes, multiplexes and new accessory units that are either detached, created by an addition on an existing single-family dwelling or created by converting nonhabitable space. Accessory dwelling units within the footprint of an existing dwelling unit's habitable space are not required to pay the fee.

    • (3) "Office" includes facilities primarily used for professional (medical, legal, engineering, accounting), general commercial, financial, insurance and other offices which do not function primarily for walk-in services, as well as uses with a similar impact on the services or facilities for which the fee is assessed.

    • (4) "Retail" includes facilities primarily engaged in the retail sales of goods or services to the general public or to small businesses. This category includes automobile dealers, non-fast-food restaurants, hospitals, schools, colleges, banks, and uses with a similar impact on the services or facilities for which the fee is assessed.

    • (5) "Industrial" includes facilities primarily engaged in manufacturing, processing and

Downloaded from https://ecode360.com/HE4476 on 2026-07-06

City of Hercules, CA

Sec. 10-18.602

LAND USE

Sec. 10-18.603

assembling goods, business and construction services, passenger and freight transportation, research and development and uses with a similar impact on the services or facilities for which the fee is assessed.

  • (6) "Hotel" includes buildings used for the overnight lodging of guests for less than thirty (30) days and uses with a similar impact on traffic volume.

  • (7) "Fast food/drive through" are generally those convenience food places that generate much higher traffic rates than other retail uses due to their high turnover.

  • (8) "Fuel station pumps" (excludes convenience store building) allocate fees based on the traffic generation for fuel stations, as the fuel canopy square footage does not adequately capture the traffic impacts.

  • (9) Other uses are uses not specifically set forth in subsections (f)(1) through (8) of this Section in accordance with the 2019 Hercules Transportation Impact Fee Nexus Study.

  • (Ord. 364 § 2 (part), 2001; Ord. 518 § 1 (Exh. A (part)), 2019)

Sec. 10-18.603. Fee Requirement.

Esta sección aún no está traducida y se muestra en inglés.

  • (a) General. The amount of the fee shall be established by resolution of the City Council and is based upon the following considerations:

    • (1) Development will pay only for improvements where there is a reasonable relationship between the improvements and the traffic generated by the new development.

    • (2) Each type of development shall contribute to the needed improvements in proportion to the use of the improvements by that type of development.

  • (b) Type of Development Subject to the Fee. The categories of land uses for which the fee will be charged are listed below, based on each use's dwelling unit equivalents (accounting for trip lengths) in the Nexus Study.

    • (1) Single-family residential: per unit;

    • (2) Multifamily residential: per unit;

    • (3) Office: per square foot;

    • (4) Retail: per square foot;

    • (5) Industrial: per square foot;

    • (6) Hotel: per room;

    • (7) Fast food/drive through: per square foot;

    • (8) Fuel station: pumps;

    • (9) Other uses not specifically set forth, consistent with the 2019 Hercules Transportation Impact Fee Nexus Study.

  • (c) When and How Applicable. The fee is imposed upon issuance of a development permit, certificate of occupancy or change of use. A "development permit" means any permit or

Downloaded from https://ecode360.com/HE4476 on 2026-07-06

City of Hercules, CA

Sec. 10-18.603

HERCULES CODE

Sec. 10-18.606

approval from the City, including but not limited to subdivision maps, final planned development permit, building permit, or other permit for construction or reconstruction. The fee applies as follows:

  • (1) The fee for residential construction is for each dwelling unit. There is no fee for unit replacement or remodeling or for an addition to an existing unit not resulting in a new accessory dwelling unit.

  • (2) The fee per square foot for retail, office and similar construction is imposed on a per square foot basis for all new floor area including additions where floor area is increased, and on a per-room basis for hotel construction. There is no fee for remodeling or restoration where floor area is improved or replaced but not increased.

  • (3) A fee may be due for a change in land use category. The fee is based upon the incremental difference between the current applicable fee for the prior use and the current fee for the proposed new use.

  • (d) Improvements. The fee shall be based on the cost of the improvements attributable to new development as determined in the 2019 Hercules Transportation Impact Fee Nexus Study. The improvements included in the total cost are set forth in the 2019 Hercules Transportation Impact Fee Nexus Study, and do not and shall not include the costs to alleviate existing deficiencies in the circulation system.

  • (Ord. 364 § 2 (part), 2001; Ord. 518 § 1 (Exh. A (part)), 2019)

Sec. 10-18.604. Exemptions and Credit.

Esta sección aún no está traducida y se muestra en inglés.

  • (a) No fee is due if a traffic or transportation facilities impact fee was previously paid in full for a particular property and use.

  • (b) No fee is due for an increase in floor area of a retail use when such increase does not expand existing floor area by more than ten percent (10%) or seven hundred fifty (750) square feet.

  • (Ord. 364 § 2 (part), 2001; Ord. 518 § 1 (Exh. A (part)), 2019)

Sec. 10-18.605. Time of Payment.

Esta sección aún no está traducida y se muestra en inglés.

The time for payment of the traffic facilities fee shall be established by resolution of the City Council setting the fee and shall conform to the requirements of Government Code Section 66007.

(Ord. 364 § 2 (part), 2001; Ord. 518 § 1 (Exh. A (part)), 2019)

Sec. 10-18.606. Transportation Facilities Fee Impact Fund—Use of Fee.

Esta sección aún no está traducida y se muestra en inglés.

  • (a) The City shall deposit the fees collected under this Article in a special fund, the Transportation Facilities Impact Fee Fund (previously known as the Traffic Facilities Impact Fee Fund), designated for transportation facilities improvements.

  • (b) The fees and any interest earned shall be used only to:

    • (1) Complete the transportation improvement projects specified in the 2019 Hercules Transportation Impact Fee Nexus Study and any amendment thereto or to reimburse the City for such construction if funds were advanced by the City from other sources; or

Downloaded from https://ecode360.com/HE4476 on 2026-07-06

City of Hercules, CA

Sec. 10-18.606

LAND USE

Sec. 10-18.609

  • (2) Reimburse developers who have been required or permitted to install such improvements (after the effective date of this Article) which are oversized with supplemental size, length or capacity relative to the demand generated by the proposed project contained in the improvement list; or

(3) Reimburse the City for its reasonable costs in administering this Article.

(Ord. 364 § 2 (part), 2001; Ord. 518 § 1 (Exh. A (part)), 2019)

Sec. 10-18.607. Authority for Separate Mitigation Measures.

Esta sección aún no está traducida y se muestra en inglés.

Fees collected under this Article are not intended to replace or limit other City requirements to provide site-specific mitigation of site-specific traffic impacts imposed upon development projects as part of normal development review process.

(Ord. 364 § 2 (part), 2001; Ord. 518 § 1 (Exh. A (part)), 2019)

Sec. 10-18.608. Annual Review/Index Adjustment.

Esta sección aún no está traducida y se muestra en inglés.

The City Council shall, as it deems necessary, review the traffic facilities fee authorized by this Article, implementing Council resolutions and supporting documentation, including the 2019 Hercules Transportation Impact Fee Nexus Study as amended, supplemented or replaced from time to time and any traffic mitigation or other studies, and may, based on such review, institute an amended traffic facilities impact fee program.

Effective July 1, 2020, and on each subsequent anniversary date of such date, the amount of each of the transportation facilities impact fees, set forth above, shall increase or decrease by the annual percentage change in the Engineering News-Record Construction Cost Index for the San Francisco Bay Area for the twelve (12) month period ending with the February index of the same calendar year. The percentage change will be calculated by staff and presented to City Council with the annual update to the Master Fee Schedule.

(Ord. 364 § 2 (part), 2001; Ord. 518 § 1 (Exh. A (part)), 2019)

Sec. 10-18.609. General Provisions Apply.

Esta sección aún no está traducida y se muestra en inglés.

Article 1 applies to this transportation facilities impact fee. (Ord. 364 § 2 (part), 2001; Ord. 518 § 1 (Exh. A (part)), 2019)

Downloaded from https://ecode360.com/HE4476 on 2026-07-06

City of Hercules, CA

Sec. 10-19.101

LAND USE

Sec. 10-18.609

CHAPTER 19 INCLUSIONARY HOUSING

Downloaded from https://ecode360.com/HE4476 on 2026-07-06

City of Hercules, CA

Sec. 10-19.101

LAND USE

Sec. 10-19.103

Article 1 General Provisions

Obtén una respuesta en español sencillo con una cita a este texto.

Pregúntale a la IA sobre este código
Contenido — Hercules Planning Code

GoCodebook ofrece acceso público, búsqueda, citas, explicación multilingüe e interpretación práctica de normas de construcción legalmente adoptadas. No sustituye a las publicaciones oficiales del ICC ni de los códigos de California.