Woodside · Building on your lot
Building on your lot in Woodside
Woodside limits the space home businesses use and requires a town permit for them. The town also has a section on fences, walls, gates, pylons and berms.
Key points
- Fences: Woodside has a town section on fences, walls, gates, pylons and berms (§ 153.212).
- Home business: Woodside home businesses may use 1/4 of the main residence or 400 square feet, whichever is less, and need a town permit.
Each rule below is marked Woodside code or CA state law and links to the section it comes from (checked October 2026). General information, not legal advice.
Running a business from home
| Space used |
|
|---|---|
| Employees |
|
| Permit |
|
| Businesses not allowed |
|
Lot splits under SB 9
| How the lot may be divided |
|
|---|---|
| Unit size |
|
| Setbacks |
|
| Standards |
|
| Parking |
|
Solar panels and EV chargers
| EV charger permit |
|
|---|---|
| Solar permit process |
|
Tree removal
| Permit to remove |
|
|---|---|
| Replacement trees |
|
Pets, chickens and bees
| Large animals |
|
|---|
Other Woodside rules on this
Woodside's code also has these chapters. We have not summarized their values on this page yet; read them in the library.
- Fences, walls, gates, pylons and berms (§ 153.212)
- Grading limits around pools and sport courts (Sec. 151.42)
Who this affects
Frequently asked questions
How tall can a fence be in Woodside?
Woodside has a town section on fences, walls, gates, pylons and berms (§ 153.212). Woodside also has a related rule: Fences, walls, gates, pylons and berms (§ 153.212).
Can I run a business from my home in Woodside?
Woodside home businesses may use 1/4 of the main residence or 400 square feet, whichever is less, and need a town permit.
Can I split my lot under SB 9 in Woodside?
Woodside's code: Each new lot must be at least 40% of the existing lot or 1,200 square feet, whichever is greater. (SB 9 lot splits.) (§ 152.164); Up to 800 square feet. (SB 9 units on lots over 1,200 square feet in single-family zones: R-1, SR, RR and SCP.) (§ 153.986).
Do I need a permit for solar panels or an EV charger in Woodside?
Woodside's code: Apply by email, or in person at the Building Division counter during business hours; electronic signatures accepted. (EV charging station permits.) (§ 150.54); Apply by email or online, or in person at the Building Division counter during regular business hours. (Small residential rooftop solar energy systems.) (§ 150.34).
Do I need a permit to remove a tree in Woodside?
Woodside's code: A permit is granted for diseased or hazardous trees, or for removal needed for construction under a valid permit. (Significant trees; also thinning recommended by an arborist or fire district, or non-landmark eucalyptus, acacia or Monterey pine.) (§ 153.436); Yes, a permit is required. (Tree destruction.) (§ 153.434).
Can I keep chickens or bees at my home in Woodside?
Woodside's code: Existing nonconforming livestock uses or structures may continue; the right ends after 1 year or more of abandonment. (Nonconforming livestock uses or structures used for livestock.) (§ 115.07).
General information, not legal advice.
Ask about a specific Woodside property
Ask GoCodebook how these rules apply to your address and get an answer that cites the section.
Ask your question