California ADU rules · Mendocino County
Can I Build an ADU in Ukiah?
Yes — you can build an ADU in Ukiah. California's statewide ADU law requires every city, including Ukiah, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.
Can you build one?
ADUs allowed
CA state lawYes — by right
ADUs and JADUs are allowed by right in all residential and mixed-use zones; ministerial approval, no hearing.
Units on a single-family lot
CA state law1 ADU + 1 JADU
At least one ADU and one JADU per single-family lot (a conversion ADU may also be possible).
Units on a multifamily lot
Local ruleUp to 8 detached ADUs on a lot with an existing multifamily dwelling (2 detached on a proposed multifamily lot) + conversions up to 25% of existing units
On a lot with an existing multifamily dwelling, up to 8 detached ADUs plus conversions of non-livable space up to 25% of existing units — never exceeding the number of existing units. A proposed-multifamily lot is limited to 2 detached ADUs. Tracks state law (SB 1211).
Junior ADU (JADU)
CA state lawAllowed
Up to 500 sq ft, within the walls of an existing single-family home (single-family lots only).
Size & height
Max detached ADU size
Local rule1,200 sq ft
Detached ADU capped at 1,200 sq ft (Ukiah's local maximum, equal to the statewide default), with NO maximum size on a lot with a multifamily structure; conversions of existing accessory structures or part of the primary residence are not subject to a size cap. 800 sq ft remains the state-protected by-right floor, not Ukiah's maximum.
Max attached ADU size
CA state law50% of the primary dwelling, but ≥850 sq ft (≥1,000 sq ft for 2+ bedrooms) is always allowed
Guaranteed minimum size
CA state law800 sq ft
An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).
Max JADU size
CA state law500 sq ft
Max height
Local rule20 ft
Ukiah allows detached ADUs up to 20 ft by right (above the 16-ft state floor); a detached ADU over 20 ft may be approved through a minor site development permit (a discretionary path). Attached ADUs and ADUs above a garage may reach 25 ft or the base-zone maximum, whichever is greater, and an ADU may be taller than the primary residence.
Setbacks
Side setback
CA state law4 ft
A city cannot require more than 4 ft side or rear setback; conversions of existing structures are exempt.
Rear setback
CA state law4 ft
Front setback
Local ruleSame as the existing primary residence, but no closer than 5 ft for a new detached ADU over 800 sq ft; no front setback applies to a detached ADU of 800 sq ft or less, or to any detached ADU associated with a multifamily dwelling
Separation from main house
CA state lawNone required
No statewide separation requirement between the ADU and the primary dwelling.
Parking
Parking required
CA state lawUp to 1 space
At most 1 space per ADU (or per bedroom, whichever is less) — and waived in the common cases below.
Transit parking exemption
CA state lawYes — no parking required near transit & for conversions
No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.
Garage-conversion replacement parking
CA state lawNot required
When a garage/carport is demolished or converted to build an ADU, replacement parking cannot be required.
Approval, timeline & cost
Approval path
CA state lawMinisterial (by right)
No public hearing or discretionary design review for a qualifying ADU.
Approval timeline
CA state law60 days
The agency must act within 60 days of a complete application — and the ADU is deemed approved if it does not.
Owner-occupancy
CA state lawOnly for a JADU
No owner-occupancy requirement for ADUs (the prior sunset was removed). A JADU may require owner-occupancy, principally where it shares sanitation with the main house.
Impact-fee waiver
CA state lawWaived under 750 sq ft
An ADU of 750 sq ft or less pays no impact fees (the 750 sq ft threshold itself is exempt under § 66311.5); larger ADUs pay fees proportional to the primary dwelling. JADUs (≤ 500 sq ft) are exempt.
Permits required
CA state lawBuilding permit
Only a ministerial building permit — no conditional use permit or discretionary design review for a qualifying ADU.
Ukiah has a standalone ADU ordinance — Ukiah City Code Article 5.3 (§§ 9056–9056.7), adopted as Ord. 1244 (2024) and amended by Ord. 1258 (2025) to address HCD compliance findings. The most useful local specifics: detached ADUs may reach 20 ft by right (vs. the 16-ft state floor) and up to 25 ft on a discretionary minor site development permit, attached/over-garage ADUs up to 25 ft, and a 1,200 sq ft detached cap (no cap on multifamily lots). Detached ADUs over 800 sq ft must keep a 5-ft front setback; smaller ones and conversions are exempt. The city also offers three sets of free pre-engineered ADU plans. Confirm fire-resistive construction requirements in the State Responsibility Area with Ukiah Community Development.
Frequently asked questions
Can I build an ADU in Ukiah?
Yes. California's statewide ADU law requires Ukiah to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.
How big can an ADU be in Ukiah?
A detached ADU of at least 1,200 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.
What are the setback requirements for an ADU in Ukiah?
Side and rear setbacks are limited to 4 ft. Same as the existing primary residence, but no closer than 5 ft for a new detached ADU over 800 sq ft; no front setback applies to a detached ADU of 800 sq ft or less, or to any detached ADU associated with a multifamily dwelling.
Is parking required for an ADU in Ukiah?
Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.
How long does ADU approval take in Ukiah?
A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.
Do I have to live on the property to build an ADU in Ukiah?
Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.
Sources
- Ukiah City Code § 9056 et seq. (Art. 5.3, Accessory Dwelling Units; Ord. 1258)
- Ukiah City Code § 9056.2(B)(2)
- Ukiah City Code § 9056.2(C) (Size)
- Ukiah City Code § 9056.6 (Height)
- Ukiah City Code § 9056.3(A) (Setbacks)
- Cal. Gov. Code §§ 66310–66342 (ADU Law)
- HCD 2025 Accessory Dwelling Unit Handbook
- Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
- Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
- Cal. Gov. Code § 66333 (junior ADUs)
- Cal. Gov. Code § 66321 (size minimums & height)
- Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
- Cal. Gov. Code § 66314 (local ordinance standards)
- Cal. Gov. Code § 66315 (owner-occupancy)
- Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)
Last updated 2026-06-28. This is an AI-assisted summary of Ukiah's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Ukiah Planning before relying on it.