Tustin · Zoning · PR
Tustin PR zoning: height, setbacks and lot size
In Tustin's PR zone, buildings can be up to 35 feet (Two stories) tall, the front setback is 20 feet and the minimum lot size is 7,200 sq. ft. (Tustin code, read October 2026).
Key points
- Maximum building height: 35 feet
- Maximum number of stories: Two stories
- Minimum front setback: 20 feet
- Minimum side setback: 5 feet
- Minimum rear setback: 5 feet (one-story building)
- Minimum lot size: 7,200 sq. ft.
PR (Professional Residential District) is a zoning district in Tustin. Every value below was read from the Tustin Municipal Code and links to its section (read October 2026). State laws such as the ADU and SB 9 rules can allow more on a residential lot. General information, not legal advice — read the code text and check with the city before you build.
Development standards in PR
The general rule for a typical lot in this zone. Zoning tables often attach notes, such as rules for corner lots, lots next to a residential zone, or new subdivisions only. Open “code text” under a value to see the table cell or sentence it was read from.
| Maximum building height | 35 feet See note 3 below the table in the code. § 9230 · code textTable row “PR Professional Residential District (3) (Sec. 9231)”, column “Building Height”: Two stories or 35 feet Note 3: If development is located within the Central Resources District (CR), refer to Section 9252j for additional standards. |
|---|---|
| Maximum number of stories | Two stories See note 3 below the table in the code. § 9230 · code textTable row “PR Professional Residential District (3) (Sec. 9231)”, column “Building Height”: Two stories or 35 feet Note 3: If development is located within the Central Resources District (CR), refer to Section 9252j for additional standards. |
| Minimum front setback | 20 feet See notes 3, 1 below the table in the code. § 9230 · code textTable row “PR Professional Residential District (3) (Sec. 9231)”, column “Front Yard (1)”: 20 feet Note 3: If development is located within the Central Resources District (CR), refer to Section 9252j for additional standards. Note 1: If it fronts onto secondary or primary highway then refer to Section 9271u. |
| Minimum side setback | 5 feet See notes 3, 1 below the table in the code. § 9230 · code textTable row “PR Professional Residential District (3) (Sec. 9231)”, column “Interior Side Yard (1)”: 5 feet Note 3: If development is located within the Central Resources District (CR), refer to Section 9252j for additional standards. Note 1: If it fronts onto secondary or primary highway then refer to Section 9271u. |
| Minimum rear setback | 5 feet Applies: one-story building See notes 3, 1 below the table in the code. § 9230 · code textTable row “PR Professional Residential District (3) (Sec. 9231)”, column “Rear Yard (1)”: 5 feet for one (1) story building, 10 feet for two (2) story building Note 3: If development is located within the Central Resources District (CR), refer to Section 9252j for additional standards. Note 1: If it fronts onto secondary or primary highway then refer to Section 9271u. |
| Minimum lot size | 7,200 sq. ft. See note 3 below the table in the code. § 9230 · code textTable row “PR Professional Residential District (3) (Sec. 9231)”, column “Minimum Lot Area”: 7,200 sq. ft. Note 3: If development is located within the Central Resources District (CR), refer to Section 9252j for additional standards. |
When a different number applies
The code sets other values for particular lots, buildings or locations in PR:
- Minimum rear setback: 10 feet — two-story building § 9230
Not on this page
We did not find a general lot coverage, FAR, density limit for PR in the zoning tables we read. The code may still set one elsewhere — check the Tustin Municipal Code.
Other Tustin zoning districts
Who this affects
Frequently asked questions
What is the maximum building height in Tustin's PR zone?
35 feet — Tustin Municipal Code § 9230.
What is the maximum number of stories in Tustin's PR zone?
Two stories — Tustin Municipal Code § 9230.
What is the minimum front setback in Tustin's PR zone?
20 feet — Tustin Municipal Code § 9230.
What is the minimum side setback in Tustin's PR zone?
5 feet — Tustin Municipal Code § 9230.
What is the minimum rear setback in Tustin's PR zone?
5 feet (one-story building) — Tustin Municipal Code § 9230.
General information, not legal advice.
Ask about a Tustin property in PR
Ask GoCodebook what you can build at a specific address and get an answer that cites the section.
Ask your question