California ADU rules · Monterey County

Can I Build an ADU in Soledad?

Yes — you can build an ADU in Soledad. California's statewide ADU law requires every city, including Soledad, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.

Figures below reflect Soledad's adopted ADU ordinance layered on California state law.

Can you build one?

ADUs allowed

CA state law

Yes — by right

ADUs and JADUs are allowed by right in all residential and mixed-use zones; ministerial approval, no hearing.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Units on a single-family lot

CA state law

1 ADU + 1 JADU

At least one ADU and one JADU per single-family lot (a conversion ADU may also be possible).

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Units on a multifamily lot

Local rule

conversions (>=1 or 25% of units) + up to 2 detached

Local cap of 2 detached ADUs on multifamily lots, less than state default of 8.

Soledad Municipal Code §17.38.260.C.1.b

Junior ADU (JADU)

CA state law

Allowed

Up to 500 sq ft, within the walls of an existing single-family home (single-family lots only).

Cal. Gov. Code § 66333 (junior ADUs)

Size & height

Max detached ADU size

Local rule

1,200 sq ft

Local maximum matches state cap but is explicitly set by ordinance.

Soledad Municipal Code §17.38.260.E.1

Max attached ADU size

Local rule

50% of primary, max 1,200 sq ft

Local rule adds a 1,200 sq ft cap to the 50% rule for attached ADUs.

Soledad Municipal Code §17.38.260.E.1

Guaranteed minimum size

CA state law

800 sq ft

An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).

Cal. Gov. Code § 66321 (size minimums & height)

Max JADU size

CA state law

500 sq ft

Cal. Gov. Code § 66333 (junior ADUs)

Max height

CA state law

16 ft

16 ft baseline; cities must allow 18 ft within ½ mi of a major transit stop or where the primary dwelling is two-story, and 20 ft on a lot with a multistory multifamily building.

Cal. Gov. Code § 66321 (size minimums & height)

Setbacks

Side setback

CA state law

4 ft

A city cannot require more than 4 ft side or rear setback; conversions of existing structures are exempt.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Rear setback

CA state law

4 ft

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Front setback

CA state law

No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Separation from main house

CA state law

None required

No statewide separation requirement between the ADU and the primary dwelling.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Parking

Parking required

CA state law

Up to 1 space

At most 1 space per ADU (or per bedroom, whichever is less) — and waived in the common cases below.

Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)

Transit parking exemption

CA state law

Yes — no parking required near transit & for conversions

No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.

Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)

Garage-conversion replacement parking

CA state law

Not required

When a garage/carport is demolished or converted to build an ADU, replacement parking cannot be required.

Cal. Gov. Code § 66314 (local ordinance standards)

Approval, timeline & cost

Approval path

CA state law

Ministerial (by right)

No public hearing or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Approval timeline

Local rule

60 days

Explicit local adoption of state 60-day timeline.

Soledad Municipal Code §17.38.260.C.3.a

Owner-occupancy

Local rule

Only for a JADU

Owner occupancy required for JADUs only; not for ADUs.

Soledad Municipal Code §17.38.260.D.1

Impact-fee waiver

Local rule

Waived under 750 sq ft

No impact fees for ADUs under 750 sq ft; proportional fees above.

Soledad Municipal Code §17.38.260.c

Permits required

CA state law

Building permit

Only a ministerial building permit — no conditional use permit or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Soledad-specific factors that can change the answer

State law sets the floor, but these local conditions often decide whether a specific parcel works.

Fire sprinklers not required for ADUs if not required for primary dwelling

ADUs do not trigger new fire sprinkler requirements unless the main home is also required to have them.

Soledad limits detached ADUs on multifamily lots to two, below the state default of eight. The city explicitly sets a 1,200 sq ft maximum for both detached and attached ADUs, and requires owner occupancy only for JADUs.

Frequently asked questions

Can I build an ADU in Soledad?

Yes. California's statewide ADU law requires Soledad to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.

How big can an ADU be in Soledad?

A detached ADU of at least 1,200 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.

What are the setback requirements for an ADU in Soledad?

Side and rear setbacks are limited to 4 ft. No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone.

Is parking required for an ADU in Soledad?

Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.

How long does ADU approval take in Soledad?

A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.

Do I have to live on the property to build an ADU in Soledad?

Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.

Sources

  • Soledad Municipal Code §17.38.260 (Ord. No. 748, § 2, 1-11-2023)
  • Soledad Municipal Code §17.38.260.C.1.b
  • Soledad Municipal Code §17.38.260.E.1
  • Soledad Municipal Code §17.38.260.C.3.a
  • Soledad Municipal Code §17.38.260.D.1
  • Soledad Municipal Code §17.38.260.c
  • Soledad Municipal Code §17.38.260.9
  • Cal. Gov. Code §§ 66310–66342 (ADU Law)
  • HCD 2025 Accessory Dwelling Unit Handbook
  • Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
  • Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
  • Cal. Gov. Code § 66333 (junior ADUs)
  • Cal. Gov. Code § 66321 (size minimums & height)
  • Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
  • Cal. Gov. Code § 66314 (local ordinance standards)

Last updated 2026-06-25. This is an AI-assisted summary of Soledad's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Soledad Planning before relying on it.

Will an ADU work on your Soledad lot?

Ask GoCodebook about your address and get the size, setback, parking and permit rules that actually apply to your parcel — with the exact citation.

Check my parcel free

Related