Grading and erosion control in San Anselmo
San Anselmo's own rules on grading and erosion control, with the code text for every value.
Each rule below links to the section of the San Anselmo Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.
What San Anselmo's code says
| Steepest cut or fill slope |
|
|---|---|
| Grading without a permit |
|
| Rainy-season limits |
|
Who this affects
Frequently asked questions
What are the grading rules in San Anselmo?
San Anselmo's code: No permit when less than 25 cubic yards of earth or material is moved. (Best practices for construction grading and drainage still apply.) (§ 9-18.04); October 15 to April 15: no permit for work that starts or continues then, without a special rainy season permit. (Digging, grading or fill that needs a permit; erosion control must be in place by October 15.) (§ 9-18.10).
General information, not legal advice.
Ask about a specific San Anselmo property
Ask GoCodebook how San Anselmo's grading and erosion control rules apply to your situation and get an answer that cites the section.
Ask your questionMore on building on your lot in San Anselmo
All building on your lot rules in San Anselmo
Lot splits under SB 9 in San Anselmo
RV and boat parking in San Anselmo
Solar panels and EV chargers in San Anselmo
Pets, chickens and bees in San Anselmo
Noise and construction hours in San Anselmo
Signs on homes in San Anselmo
Trash and recycling carts in San Anselmo
San Anselmo Municipal Code — full text