Rialto · Building on your lot
Building on your lot in Rialto
Rialto sets its own limits on fences, accessory buildings and home businesses. Fence height depends on the yard, the fence type and whether the yard faces a street.
Key points
- Fence height: On interior lots, solid front-yard fences are limited to 3½ feet, open fences and hedges to 6 feet; side and rear yards, 6 feet.
- Yard coverage: Accessory buildings may cover at most 25% of a rear yard; in single-family zones, all buildings together at most 30% of the lot.
- Home businesses: Every home business needs a home occupation permit (city rule).
Each rule below is marked Rialto code or CA state law and links to the section it comes from (checked October 2026). General information, not legal advice.
Fences and walls
| Corner visibility |
|
|---|---|
| Side and rear yard height |
|
| Front yard height |
|
| Permit |
|
Sheds, garages and other accessory structures
| Size or lot coverage |
|
|---|---|
| Side and rear setback |
|
| Distance from the house |
|
Running a business from home
| Permit |
|
|---|
Lot splits under SB 9
| How the lot may be divided |
|
|---|---|
| Minimum new lot size |
|
| Standards |
|
Solar panels and EV chargers
| EV charger permit |
|
|---|---|
| Solar permit process |
|
Swimming pools
Rialto code Openings no wider than 4 inches. Wire mesh openings no larger than 2 inches.
All 12 Rialto rules on swimming pools, with the code text and the state law underneath →
Who this affects
Frequently asked questions
How tall can a fence be in Rialto?
On interior lots, solid front-yard fences are limited to 3½ feet, open fences and hedges to 6 feet; side and rear yards, 6 feet.
How big can a shed or accessory building be in Rialto?
Accessory buildings may cover at most 25% of a rear yard; in single-family zones, all buildings together at most 30% of the lot.
Can I run a business from my home in Rialto?
Every home business needs a home occupation permit (city rule).
Can I split my lot under SB 9 in Rialto?
Rialto's code: Each new lot must be between 40% and 60% of the original lot area. (Applies to each lot created by an urban lot split.) (§ 17.51.050); Each new lot must be at least 1,200 square feet. (Applies to each lot created by an urban lot split.) (§ 17.51.050).
Do I need a permit for solar panels or an EV charger in Rialto?
Rialto's code: Every EV charging station needs a permit, obtained from building and safety by the owner or the owner's agent. (§ 15.64.040); Administrative expedited review; a complete application is checked against the checklist and standards. (Applies to applications with all required information and documents.) (§ 15.64.060).
General information, not legal advice.
Ask about a specific Rialto property
Ask GoCodebook how these rules apply to your address and get an answer that cites the section.
Ask your question