Solar panels and EV chargers in Pinole

Pinole's own rules on solar panels and EV chargers, with the code text for every value.

Each rule below links to the section of the Pinole Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.

What Pinole's code says

Pinole code What Pinole's code adds
EV charger permit
  • The Building Official approves an application meeting the city checklist and issues all needed permits.
    Applies: The charger may not be energized until permit, final inspection, and city and utility approval.
    § 15.58.050 · code text
    A permit application that satisfies the information requirements in the city's adopted checklist shall be deemed complete and be promptly processed.
  • Electronic submittal is allowed.
    § 15.58.050 · code text
    The Building Official shall allow for electronic submittal of permit applications covered by this chapter and associated supporting documentations.
Solar permit process
  • Expedited administrative, nondiscretionary review; permit issued when the checklist and standard plan are met.
    Applies: Small residential rooftop solar systems that meet the city's checklist and standard plan.
    § 15.56.060 · code text
    The Building Division shall implement the following administrative, nondiscretionary review process to expedite the approval of small residential rooftop solar energy system applications.
Review time
  • Within 3 business days.
    Applies: Small residential rooftop solar applications that meet the city's checklist and standard plan.
    § 15.56.060 · code text
    For an application for a small residential rooftop solar energy system that meets the requirements of the City's checklist and standard plan, the Building Division shall issue a building permit or other non-discretionary permit or authorization within three (3) business days.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

Do I need a permit for solar panels or an EV charger in Pinole?

Pinole's code: Expedited administrative, nondiscretionary review; permit issued when the checklist and standard plan are met. (Small residential rooftop solar systems that meet the city's checklist and standard plan.) (§ 15.56.060); The Building Official approves an application meeting the city checklist and issues all needed permits. (The charger may not be energized until permit, final inspection, and city and utility approval.) (§ 15.58.050).

General information, not legal advice.