Pinole · Building on your lot
Solar panels and EV chargers in Pinole
Pinole's own rules on solar panels and EV chargers, with the code text for every value.
Each rule below links to the section of the Pinole Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.
What Pinole's code says
| EV charger permit |
|
|---|---|
| Solar permit process |
|
| Review time |
|
Who this affects
Frequently asked questions
Do I need a permit for solar panels or an EV charger in Pinole?
Pinole's code: Expedited administrative, nondiscretionary review; permit issued when the checklist and standard plan are met. (Small residential rooftop solar systems that meet the city's checklist and standard plan.) (§ 15.56.060); The Building Official approves an application meeting the city checklist and issues all needed permits. (The charger may not be energized until permit, final inspection, and city and utility approval.) (§ 15.58.050).
General information, not legal advice.
Ask about a specific Pinole property
Ask GoCodebook how Pinole's solar panels and EV chargers rules apply to your situation and get an answer that cites the section.
Ask your questionMore on building on your lot in Pinole
All building on your lot rules in Pinole
Sheds, garages and other accessory structures in Pinole
Running a business from home in Pinole
Lot splits under SB 9 in Pinole
Tree removal in Pinole
Grading and erosion control in Pinole
Garage and yard sales in Pinole
Affordable units in new housing (inclusionary) in Pinole
Parking spaces required for homes in Pinole
Signs on homes in Pinole
Pinole Municipal Code — full text