Yes — you can build an ADU in Palos Verdes Estates. California's statewide ADU law requires every city, including Palos Verdes Estates, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.

Figures below reflect Palos Verdes Estates's adopted ADU ordinance layered on California state law.

Can you build one?

ADUs allowed

CA state law

Yes — by right

ADUs and JADUs are allowed by right in all residential and mixed-use zones; ministerial approval, no hearing.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Units on a single-family lot

CA state law

1 ADU + 1 JADU

At least one ADU and one JADU per single-family lot (a conversion ADU may also be possible).

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Units on a multifamily lot

CA state law

Conversion ADUs (≥1, up to 25% of units) + up to 8 detached

Conversions of non-livable space (at least 1, or up to 25% of existing units) plus up to 8 detached ADUs on a lot with existing multifamily — never exceeding the number of existing units. JADUs are single-family only.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Junior ADU (JADU)

CA state law

Allowed

Up to 500 sq ft, within the walls of an existing single-family home (single-family lots only).

Cal. Gov. Code § 66333 (junior ADUs)

Size & height

Max detached ADU size

Local rule

1,200 sq ft

PVE allows a detached ADU up to 1,200 sq ft (the state default ceiling), not merely the 800 sq ft by-right floor. An attached ADU is limited to the lesser of 1,000 sq ft or 50% of the primary dwelling, subject to the state-protected 850/1,000 sq ft minimums.

PVEMC § 18.45.040

Max attached ADU size

CA state law

50% of the primary dwelling, but ≥850 sq ft (≥1,000 sq ft for 2+ bedrooms) is always allowed

Cal. Gov. Code § 66321 (size minimums & height)

Guaranteed minimum size

CA state law

800 sq ft

An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).

Cal. Gov. Code § 66321 (size minimums & height)

Max JADU size

CA state law

500 sq ft

Cal. Gov. Code § 66333 (junior ADUs)

Max height

Local rule

16 ft

PVE limits ADUs to 16 ft, effectively barring a 2-story detached ADU. State law still requires the city to allow at least 18 ft within ½ mi of a major transit stop or where the primary dwelling is two-story (and 16 ft otherwise); HCD's 4-4-2024 letter flagged PVE's height-measurement method, so confirm how the 16 ft is measured.

PVEMC § 18.45.040

Setbacks

Side setback

CA state law

4 ft

A city cannot require more than 4 ft side or rear setback; conversions of existing structures are exempt.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Rear setback

CA state law

4 ft

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Front setback

CA state law

No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Separation from main house

CA state law

None required

No statewide separation requirement between the ADU and the primary dwelling.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Parking

Parking required

CA state law

Up to 1 space

At most 1 space per ADU (or per bedroom, whichever is less) — and waived in the common cases below.

Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)

Transit parking exemption

CA state law

Yes — no parking required near transit & for conversions

No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.

Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)

Garage-conversion replacement parking

CA state law

Not required

When a garage/carport is demolished or converted to build an ADU, replacement parking cannot be required.

Cal. Gov. Code § 66314 (local ordinance standards)

Approval, timeline & cost

Approval path

CA state law

Ministerial (by right)

No public hearing or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Approval timeline

CA state law

60 days

The agency must act within 60 days of a complete application — and the ADU is deemed approved if it does not.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Owner-occupancy

CA state law

Only for a JADU

No owner-occupancy requirement for ADUs (the prior sunset was removed). A JADU may require owner-occupancy, principally where it shares sanitation with the main house.

Cal. Gov. Code § 66315 (owner-occupancy)

Impact-fee waiver

CA state law

Waived under 750 sq ft

An ADU of 750 sq ft or less pays no impact fees (the 750 sq ft threshold itself is exempt under § 66311.5); larger ADUs pay fees proportional to the primary dwelling. JADUs (≤ 500 sq ft) are exempt.

Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Permits required

CA state law

Building permit

Only a ministerial building permit — no conditional use permit or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Palos Verdes Estates-specific factors that can change the answer

State law sets the floor, but these local conditions often decide whether a specific parcel works.

Hillside / geotechnical review

PVE is a steep, hillside-built community. A soils/geotechnical report is commonly required for ADUs on sloped lots, areas of significant grading, or with special foundation needs — a real cost and timeline factor even though it cannot be used to deny a code-compliant ADU.

Palos Verdes Homes Association referral

PVEMC § 18.45.040 requires the applicant to provide a copy of the ADU application to the Palos Verdes Homes Association within five days of submittal to the city. The HOA review is a notice/coordination step and cannot lawfully block or unreasonably delay a qualifying ADU (Civ. Code §§ 4740–4741).

Coastal Zone (portions)

Limited coastal-adjacent areas of PVE may fall under Local Coastal Program review; most of the city is not in the Coastal Zone. Confirm parcel-specific coastal status with Planning.

Palos Verdes Estates regulates ADUs in PVEMC Chapter 18.45 (Ord. 020-747, amended by Ords. 760 and 765). Distinctive local rules for this built-out hillside city: detached ADUs are capped at 16 ft (no 2-story, subject to the state transit/two-story exceptions), applications must be copied to the Palos Verdes Homes Association within five days, ADU design must harmonize with the main dwelling, and hillside lots typically trigger a soils/geotechnical report. Single-family lots get one ADU plus one JADU; multifamily detached ADUs are capped at two. HCD's April 4, 2024 review letter required the city to fix its height-measurement method and other items, so confirm the current conformed text with Planning before relying on the printed standards.

Frequently asked questions

Can I build an ADU in Palos Verdes Estates?

Yes. California's statewide ADU law requires Palos Verdes Estates to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.

How big can an ADU be in Palos Verdes Estates?

A detached ADU of at least 1,200 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.

What are the setback requirements for an ADU in Palos Verdes Estates?

Side and rear setbacks are limited to 4 ft. No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone.

Is parking required for an ADU in Palos Verdes Estates?

Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.

How long does ADU approval take in Palos Verdes Estates?

A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.

Do I have to live on the property to build an ADU in Palos Verdes Estates?

Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.

Sources

  • Palos Verdes Estates Mun. Code Ch. 18.45 (Ord. 020-747; amended Ords. 760, 765)
  • PVEMC § 18.45.040
  • Palos Verdes Estates Mun. Code § 18.45 (Accessory Dwelling Units)
  • PVEMC § 18.45.040 C.3
  • Cal. Gov. Code §§ 66310–66342 (ADU Law)
  • HCD 2025 Accessory Dwelling Unit Handbook
  • Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
  • Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
  • Cal. Gov. Code § 66333 (junior ADUs)
  • Cal. Gov. Code § 66321 (size minimums & height)
  • Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
  • Cal. Gov. Code § 66314 (local ordinance standards)
  • Cal. Gov. Code § 66315 (owner-occupancy)
  • Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Last updated 2026-06-28. This is an AI-assisted summary of Palos Verdes Estates's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Palos Verdes Estates Planning before relying on it.

Will an ADU work on your Palos Verdes Estates lot?

Ask GoCodebook about your address and get the size, setback, parking and permit rules that actually apply to your parcel — with the exact citation.

Check my parcel free

Related