Solar panels and EV chargers in Mountain House

Mountain House's own rules on solar panels and EV chargers, with the code text for every value.

Each rule below links to the section of the Mountain House Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.

What Mountain House's code says

Mountain House code What Mountain House's code adds
EV charger permit
  • The Department approves and issues all required permits when the complete application and checklist meet the electrical code.
    Applies: Electronic submittal and electronic signatures are accepted.
    § 8-3-103 · code text
    In accepting such permit applications, the Department shall also accept electronic signatures on all forms, applications, and other documentation in lieu of a wet signature by the applicant.
  • No discretionary use permit is required.
    § 8-3-104 · code text
    The Department shall confirm information provided in the application and checklist is consistent with all applicable laws and health and safety standards and shall not require any discretionary use permit.
Solar permit process
  • Written approval or denial once the application is confirmed complete and code-compliant; approval comes with all required permits.
    Applies: Small residential rooftop solar energy systems; the Department checks them against the California Building Standards Codes.
    § 8-2-101 · code text
    The expedited, streamlined permitting process for small residential rooftop solar energy systems shall comply with the applicable requirements contained in Division 1, Chapter 1 of the Mountain House Municipal Code and all the following:
  • Electronic submittal and electronic signatures are allowed.
    Applies: Small residential rooftop solar permits, as available resources allow.
    § 8-2-101 · code text
    As allowed by available resources, the Department shall allow for electronic submittal of a permit application and associated documentation and shall allow electronic signature in lieu of a wet signature.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

Do I need a permit for solar panels or an EV charger in Mountain House?

Mountain House's code: Written approval or denial once the application is confirmed complete and code-compliant; approval comes with all required permits. (Small residential rooftop solar energy systems; the Department checks them against the California Building Standards Codes.) (§ 8-2-101); The Department approves and issues all required permits when the complete application and checklist meet the electrical code. (Electronic submittal and electronic signatures are accepted.) (§ 8-3-103).

General information, not legal advice.