California ADU rules · Contra Costa County

Can I Build an ADU in Moraga?

Yes — you can build an ADU in Moraga. California's statewide ADU law requires every city, including Moraga, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.

Figures below reflect Moraga's adopted ADU ordinance layered on California state law.

Can you build one?

ADUs allowed

Local rule

Conditional

Ministerial (by-right) for ADUs/JADUs meeting objective standards; discretionary (conditional use permit) if standards not met.

Moraga Municipal Code §§ 8.124.100, 8.124.120, 8.124.180

Units on a single-family lot

CA state law

1 ADU + 1 JADU

At least one ADU and one JADU per single-family lot (a conversion ADU may also be possible).

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Units on a multifamily lot

Local rule

conversions (>=1 or 25% of units) + up to 2 detached

Only 2 detached ADUs allowed per multifamily lot, not 4 or 8.

Moraga Municipal Code § 8.124.110

Junior ADU (JADU)

CA state law

Allowed

Up to 500 sq ft, within the walls of an existing single-family home (single-family lots only).

Cal. Gov. Code § 66333 (junior ADUs)

Size & height

Max detached ADU size

CA state law

1,200 sq ft

Statewide default cap for detached new-construction ADUs in the absence of a compliant local ADU ordinance. The unconditional by-right floor a city must always allow is 800 sq ft (see Guaranteed minimum size); a city with a compliant ordinance may set its own ceiling.

Max attached ADU size

Local rule

50% of primary, <=850 (1 bed) or <=1,000 (2+ beds); 800 sq ft cap if lot exceeds max floor area

Attached ADUs: 850/1,000 sq ft max, but cannot exceed 50% of primary; 800 sq ft cap if lot is over max FAR.

Moraga Municipal Code § 8.124.130.H

Guaranteed minimum size

CA state law

800 sq ft

An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).

Cal. Gov. Code § 66321 (size minimums & height)

Max JADU size

CA state law

500 sq ft

Cal. Gov. Code § 66333 (junior ADUs)

Max height

Local rule

16 ft

Max 16 ft within 10 ft of property line; up to 19 ft elsewhere on lot.

Moraga Municipal Code § 8.124.130.E

Setbacks

Side setback

CA state law

4 ft

A city cannot require more than 4 ft side or rear setback; conversions of existing structures are exempt.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Rear setback

CA state law

4 ft

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Front setback

CA state law

No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Separation from main house

Local rule

None required

No explicit separation required if setbacks and fire safety are met.

Moraga Municipal Code § 8.124.130.A

Parking

Parking required

Local rule

Up to 1 space

1 off-street space per ADU; exemptions for transit, conversions, historic, car share, etc.

Moraga Municipal Code § 8.124.130.K

Transit parking exemption

CA state law

Yes — no parking required near transit & for conversions

No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.

Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)

Garage-conversion replacement parking

CA state law

Not required

When a garage/carport is demolished or converted to build an ADU, replacement parking cannot be required.

Cal. Gov. Code § 66314 (local ordinance standards)

Approval, timeline & cost

Approval path

CA state law

Ministerial (by right)

No public hearing or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Approval timeline

CA state law

60 days

The agency must act within 60 days of a complete application — and the ADU is deemed approved if it does not.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Owner-occupancy

Local rule

Only for a JADU

No owner-occupancy for ADUs; required for JADUs.

Moraga Municipal Code §§ 8.124.100.C, 8.124.110.B.2

Impact-fee waiver

CA state law

Waived under 750 sq ft

An ADU of 750 sq ft or less pays no impact fees (the 750 sq ft threshold itself is exempt under § 66311.5); larger ADUs pay fees proportional to the primary dwelling. JADUs (≤ 500 sq ft) are exempt.

Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Permits required

CA state law

Building permit

Only a ministerial building permit — no conditional use permit or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Moraga-specific factors that can change the answer

State law sets the floor, but these local conditions often decide whether a specific parcel works.

Hillside development permit exemption

Ministerial ADUs are exempt from hillside development permit requirements; discretionary ADUs are not.

Historic district

Historic district rules may apply for demolition/alteration of structures for ADUs.

Moraga caps ministerial detached ADUs at 800 sq ft and allows only 2 detached ADUs on multifamily lots. Ministerial ADUs are exempt from hillside development permits.

Frequently asked questions

Can I build an ADU in Moraga?

Yes. California's statewide ADU law requires Moraga to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.

How big can an ADU be in Moraga?

A detached ADU of at least 1,200 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.

What are the setback requirements for an ADU in Moraga?

Side and rear setbacks are limited to 4 ft. No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone.

Is parking required for an ADU in Moraga?

Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.

How long does ADU approval take in Moraga?

A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.

Do I have to live on the property to build an ADU in Moraga?

Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.

Sources

  • Moraga Municipal Code Chapter 8.124 (ADUs & JADUs), Ord. No. 309, § 5(Exh. B, 11), 5-10-2023; Ord. No. 296, § 3, 4-14-2021
  • Moraga Municipal Code §§ 8.124.100, 8.124.120, 8.124.180
  • Moraga Municipal Code § 8.124.110
  • Moraga Municipal Code § 8.124.130.H
  • Moraga Municipal Code § 8.124.130.E
  • Moraga Municipal Code § 8.124.130.A
  • Moraga Municipal Code § 8.124.130.K
  • Moraga Municipal Code §§ 8.124.100.C, 8.124.110.B.2
  • Moraga Municipal Code § 8.124.080.A
  • Moraga Municipal Code § 8.124.090
  • Cal. Gov. Code §§ 66310–66342 (ADU Law)
  • HCD 2025 Accessory Dwelling Unit Handbook
  • Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
  • Cal. Gov. Code § 66333 (junior ADUs)
  • Cal. Gov. Code § 66321 (size minimums & height)
  • Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
  • Cal. Gov. Code § 66314 (local ordinance standards)
  • Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
  • Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Last updated 2026-06-25. This is an AI-assisted summary of Moraga's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Moraga Planning before relying on it.

Will an ADU work on your Moraga lot?

Ask GoCodebook about your address and get the size, setback, parking and permit rules that actually apply to your parcel — with the exact citation.

Check my parcel free

Related