California ADU rules · Los Angeles County

Can I Build an ADU in Monterey Park?

Yes — you can build an ADU in Monterey Park. California's statewide ADU law requires every city, including Monterey Park, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.

Figures below reflect Monterey Park's adopted ADU ordinance layered on California state law.

Can you build one?

ADUs allowed

CA state law

Yes — by right

ADUs and JADUs are allowed by right in all residential and mixed-use zones; ministerial approval, no hearing.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Units on a single-family lot

Local rule

1 detached ADU (new, up to 800 sqft, 4' setbacks) + 1 JADU (within existing/proposed SFR, up to 500 sqft) + 1 ADU converted from existing space (e.g., garage conversion); all three may be allowed if site conditions permit

Allows up to 3 units (1 detached ADU, 1 JADU, 1 conversion ADU) on a single-family lot if site conditions allow.

Monterey Park Zoning Code, Ch. 21.50; Gov. Code § 66323

Units on a multifamily lot

Local rule

Conversions: at least 1 ADU or up to 25% of existing units from non-livable space; up to 2 detached ADUs (new) on lot with proposed multifamily; up to 8 detached ADUs (new) on lot with existing multifamily, not to exceed number of existing units

Detached ADU cap on existing multifamily lots is the lesser of 8 or the number of existing units.

Monterey Park Zoning Code, Ch. 21.50; Gov. Code § 66323

Junior ADU (JADU)

CA state law

Allowed

Up to 500 sq ft, within the walls of an existing single-family home (single-family lots only).

Cal. Gov. Code § 66333 (junior ADUs)

Size & height

Max detached ADU size

CA state law

1,200 sq ft

Statewide default cap for detached new-construction ADUs in the absence of a compliant local ADU ordinance. The unconditional by-right floor a city must always allow is 800 sq ft (see Guaranteed minimum size); a city with a compliant ordinance may set its own ceiling.

Max attached ADU size

Local rule

50% of primary, >=850 (>=1,000 for 2+ bedrooms)

Explicitly follows state attached ADU size rule.

Monterey Park Zoning Code, Ch. 21.50; Gov. Code § 66321(b)(2)

Guaranteed minimum size

CA state law

800 sq ft

An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).

Cal. Gov. Code § 66321 (size minimums & height)

Max JADU size

CA state law

500 sq ft

Cal. Gov. Code § 66333 (junior ADUs)

Max height

Local rule

16 ft

16 ft base for detached; up to 18 ft near transit/multistory; attached ADUs up to 25 ft or primary dwelling height.

Monterey Park Zoning Code, Ch. 21.50; Gov. Code § 66321(b)(4)

Setbacks

Side setback

Local rule

4 ft

4 ft minimum for new detached ADUs.

Monterey Park Zoning Code, Ch. 21.50; Gov. Code § 66321(b)(3), § 66323(a)(2)

Rear setback

Local rule

4 ft

4 ft minimum for new detached ADUs.

Monterey Park Zoning Code, Ch. 21.50; Gov. Code § 66321(b)(3), § 66323(a)(2)

Front setback

Local rule

No minimum front setback may preclude an 800 sqft ADU with 4' side/rear setbacks; ADU may be allowed in front setback if no other location is feasible

Front setback cannot block a compliant ADU; ADU may be in front setback if needed.

Monterey Park Zoning Code, Ch. 21.50; Gov. Code § 66321(b)(3), § 66323(a)(2)

Separation from main house

CA state law

None required

No statewide separation requirement between the ADU and the primary dwelling.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Parking

Parking required

Local rule

Up to 1 space

Max 1 space per ADU or per bedroom; multiple state exemptions apply.

Monterey Park Zoning Code, Ch. 21.50; Gov. Code § 66322(a), § 66314(d)(10)

Transit parking exemption

CA state law

Yes — no parking required near transit & for conversions

No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.

Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)

Garage-conversion replacement parking

CA state law

Not required

When a garage/carport is demolished or converted to build an ADU, replacement parking cannot be required.

Cal. Gov. Code § 66314 (local ordinance standards)

Approval, timeline & cost

Approval path

CA state law

Ministerial (by right)

No public hearing or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Approval timeline

CA state law

60 days

The agency must act within 60 days of a complete application — and the ADU is deemed approved if it does not.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Owner-occupancy

CA state law

Only for a JADU

No owner-occupancy requirement for ADUs (the prior sunset was removed). A JADU may require owner-occupancy, principally where it shares sanitation with the main house.

Cal. Gov. Code § 66315 (owner-occupancy)

Impact-fee waiver

CA state law

Waived under 750 sq ft

An ADU of 750 sq ft or less pays no impact fees (the 750 sq ft threshold itself is exempt under § 66311.5); larger ADUs pay fees proportional to the primary dwelling. JADUs (≤ 500 sq ft) are exempt.

Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Permits required

Local rule

Building permit, Planning permit, Utility permit, Demolition permit (if garage conversion)

Demolition permit for garage conversion must be processed concurrently.

Monterey Park Zoning Code, § 21.50.040

Monterey Park-specific factors that can change the answer

State law sets the floor, but these local conditions often decide whether a specific parcel works.

Fire code compliance

ADUs must comply with local fire/building codes; fire sprinklers not required unless for primary dwelling.

Historic district

Additional notice/placard may be required for garage demolition in historic districts.

Monterey Park allows up to three units (detached ADU, JADU, and conversion ADU) on a single-family lot if site conditions allow, and requires additional notice for garage conversions in historic districts. The city must develop a pre-approved ADU plan program by 2025.

Frequently asked questions

Can I build an ADU in Monterey Park?

Yes. California's statewide ADU law requires Monterey Park to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.

How big can an ADU be in Monterey Park?

A detached ADU of at least 1,200 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.

What are the setback requirements for an ADU in Monterey Park?

Side and rear setbacks are limited to 4 ft. No minimum front setback may preclude an 800 sqft ADU with 4' side/rear setbacks; ADU may be allowed in front setback if no other location is feasible.

Is parking required for an ADU in Monterey Park?

Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.

How long does ADU approval take in Monterey Park?

A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.

Do I have to live on the property to build an ADU in Monterey Park?

Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.

Sources

  • Monterey Park Zoning Code, Chapter 21.50 (ADUs/JADUs); Ordinance 2261, April 16, 2025
  • Monterey Park Zoning Code, Ch. 21.50; Gov. Code § 66323
  • Monterey Park Zoning Code, Ch. 21.50; Gov. Code § 66321(b)(2)
  • Monterey Park Zoning Code, Ch. 21.50; Gov. Code § 66321(b)(4)
  • Monterey Park Zoning Code, Ch. 21.50; Gov. Code § 66321(b)(3), § 66323(a)(2)
  • Monterey Park Zoning Code, Ch. 21.50; Gov. Code § 66322(a), § 66314(d)(10)
  • Monterey Park Zoning Code, § 21.50.040
  • Monterey Park Zoning Code, Ch. 21.50; Gov. Code § 66314(e)-(f)
  • Monterey Park Zoning Code, Ch. 21.50
  • Cal. Gov. Code §§ 66310–66342 (ADU Law)
  • HCD 2025 Accessory Dwelling Unit Handbook
  • Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
  • Cal. Gov. Code § 66333 (junior ADUs)
  • Cal. Gov. Code § 66321 (size minimums & height)
  • Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
  • Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
  • Cal. Gov. Code § 66314 (local ordinance standards)
  • Cal. Gov. Code § 66315 (owner-occupancy)
  • Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Last updated 2026-06-25. This is an AI-assisted summary of Monterey Park's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Monterey Park Planning before relying on it.

Will an ADU work on your Monterey Park lot?

Ask GoCodebook about your address and get the size, setback, parking and permit rules that actually apply to your parcel — with the exact citation.

Check my parcel free