Marin County · Building on your lot
Grading and erosion control in Marin County
Marin County's own rules on grading and erosion control, with the code text for every value.
Each rule below links to the section of the Marin County Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.
What Marin County's code says
| When a grading permit is needed |
|
|---|---|
| Steepest cut or fill slope |
|
| Grading without a permit |
|
Who this affects
Frequently asked questions
What are the grading rules in Marin County?
Marin County's code: You need a grading permit to move over 250 cubic yards of earth. (§ 23.08.025); Cut and fill slopes may be no steeper than 2 to 1. (Under county development standards; steeper only with written approval backed by a geotechnical engineer or engineering geologist.) (§ 24.04.640).
General information, not legal advice.
Ask about a specific Marin County property
Ask GoCodebook how Marin County's grading and erosion control rules apply to your situation and get an answer that cites the section.
Ask your questionMore on building on your lot in Marin County
All building on your lot rules in Marin County
Sheds, garages and other accessory structures in Marin County
Running a business from home in Marin County
Tree removal in Marin County
Building in a flood zone in Marin County
Group homes and residential care in Marin County
Parking spaces required for homes in Marin County
Signs on homes in Marin County
Marin County Municipal Code — full text