Skip to content

Lake County · Zoning · TPZ

Lake County TPZ zoning: height, setbacks and lot size

In Lake County's TPZ zone, generally buildings can be up to 35 ft tall, the front setback is 30 ft from lot line or 55 ft from centerline of roadway, whichever is greater and the minimum lot size is 160 acres, with the conditions listed below (Lake County code, read October 2026).

Key points

  • Maximum building height: 35 ft (Principal structure)
  • Minimum front setback: 30 ft from lot line or 55 ft from centerline of roadway, whichever is greater
  • Minimum side setback: 15 ft
  • Minimum rear setback: 25 ft
  • Minimum lot size: 160 acres

TPZ (TIMBERLAND PRESERVE ZONE OR "TPZ" DISTRICT) is a zoning district in Lake County. Every value below was read from the Lake County Municipal Code and links to its section (read October 2026). State laws such as the ADU and SB 9 rules can allow more on a residential lot. General information, not legal advice — read the code text and check with the city before you build.

Development standards in TPZ

The general rule for a typical lot in this zone. Zoning tables often attach notes, such as rules for corner lots, lots next to a residential zone, or new subdivisions only. Open “code text” under a value to see the table cell or sentence it was read from.

Maximum building height
35 ft
Applies: Principal structure
§ 6.13 · code text
(a) Principal structure: Thirty-five (35) feet.
Minimum front setback
30 ft from lot line or 55 ft from centerline of roadway, whichever is greater
§ 6.12 · code text
(a) Front yard: Thirty (30) feet from lot line, or fifty-five (55) feet from centerline of roadway, whichever is greater. Yards abutting streets are front yards.
Minimum side setback
15 ft
§ 6.12 · code text
(c) Side yard: Fifteen (15) feet from lot line.
Minimum rear setback
25 ft
§ 6.12 · code text
(b) Rear yard: Twenty-five (25) feet from lot line.
Minimum lot size
160 acres
§ 6.11 · code text
(a) All parcels except as noted below: One hundred sixty (160) acres.

When a different number applies

The code sets other values for particular lots, buildings or locations in TPZ:

  • Minimum lot size: 40 acres — Parcels with Class I or II timberland soils and a joint timber management plan as required in Government Code Section 51119.5 § 6.11
  • Minimum lot size: 80 acres — parcels with under 40 acres of Class I or II timberland soils and a joint timber management plan § 6.11

Not on this page

We did not find a general stories, lot coverage, FAR, density limit for TPZ in the zoning tables we read. The code may still set one elsewhere — check the Lake County Municipal Code.

Other Lake County zoning districts

Who this affects

HomeownersArchitects and designersDevelopersReal estate agents

Frequently asked questions

What is the maximum building height in Lake County's TPZ zone?

35 ft (principal structure) — Lake County Municipal Code § 6.13.

What is the minimum front setback in Lake County's TPZ zone?

30 ft from lot line or 55 ft from centerline of roadway, whichever is greater — Lake County Municipal Code § 6.12.

What is the minimum side setback in Lake County's TPZ zone?

15 ft — Lake County Municipal Code § 6.12.

What is the minimum rear setback in Lake County's TPZ zone?

25 ft — Lake County Municipal Code § 6.12.

What is the minimum lot size in Lake County's TPZ zone?

160 acres — Lake County Municipal Code § 6.11.

General information, not legal advice.

Ask about a Lake County property in TPZ

Ask GoCodebook what you can build at a specific address and get an answer that cites the section.

Ask your question

More on Lake County