Solar panels and EV chargers in Laguna Hills

Laguna Hills's own rules on solar panels and EV chargers, with the code text for every value.

Each rule below links to the section of the Laguna Hills Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.

What Laguna Hills's code says

Laguna Hills code What Laguna Hills's code adds
EV charger permit
  • The application is approved administratively and all needed permits are issued.
    Applies: Only when the application meets the city's checklist and all applicable laws and health and safety standards.
    § 10-72.060 · code text
    Upon confirmation by the Building Official that the application and supporting documents meet the requirements of the city’s checklist, and is consistent with all applicable laws and health and safety standards, the Building Official shall, consistent with Government Code Section 65850.7, as may be amended from time to time, administratively approve the application and issue all necessary permits.
Solar permit process
  • Administrative, nondiscretionary review; permit issued when the application meets the checklist and standard plan; only 1 inspection.
    Applies: Applies to small residential rooftop solar systems eligible for expedited review.
    § 10-56.060 · code text
    Only one inspection shall be required and performed by the Building Department for small residential roof-top solar energy systems eligible for expedited review.
  • The inspection is scheduled within 2 business days of a request.
    Applies: Applies to small residential rooftop solar systems eligible for expedited review.
    § 10-56.060 · code text
    An inspection will be scheduled within two business days of a request.
Review time
  • Permit issued within 3 business days.
    Applies: For a small residential rooftop solar system application that meets the city's checklist and standard plan.
    § 10-56.060 · code text
    For an application for a small residential rooftop solar energy system that meets the requirements of the city’s checklist and standard plan, the Building Department shall issue a building permit or other non-discretionary permit or authorization within three business days.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

Do I need a permit for solar panels or an EV charger in Laguna Hills?

Laguna Hills's code: Administrative, nondiscretionary review; permit issued when the application meets the checklist and standard plan; only 1 inspection. (Applies to small residential rooftop solar systems eligible for expedited review.) (§ 10-56.060); The application is approved administratively and all needed permits are issued. (Only when the application meets the city's checklist and all applicable laws and health and safety standards.) (§ 10-72.060).

General information, not legal advice.

Ask about a specific Laguna Hills property

Ask GoCodebook how Laguna Hills's solar panels and EV chargers rules apply to your situation and get an answer that cites the section.