Solar panels and EV chargers in Jurupa Valley

Jurupa Valley's own rules on solar panels and EV chargers, with the code text for every value.

Each rule below links to the section of the Jurupa Valley Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.

What Jurupa Valley's code says

Jurupa Valley code What Jurupa Valley's code adds
EV charger permit
  • Expedited nondiscretionary permit when the charger meets state and federal safety rules; apply in person, mail or electronically.
    Applies: Chargers with no specific, adverse public health or safety impact. Electronic signatures are accepted.
    § 8.05.070 · code text
    Anyone seeking to install an electric vehicle charging station at any site within the city shall apply to the building official for an expedited nondiscretionary building permit.
Solar permit process
  • A permit issues for a complete application meeting the checklists and standard plans; counter or electronic submittal; 1 inspection.
    Applies: Applies to small residential rooftop solar systems. Electronic signatures are accepted.
    § 8.05.060 · code text
    The Building Official shall issue a building permit for any complete application that meets the requirements of the approved checklists and standard plans as follows: within one (1) to three (3) business days for plans submitted at the public counter and electronic applications, or as soon thereafter as may be practicable.
Review time
  • 1 to 3 business days, or as soon after as practicable.
    Applies: Complete small rooftop solar applications meeting the checklists and standard plans, at the counter or electronically.
    § 8.05.060 · code text
    The Building Official shall issue a building permit for any complete application that meets the requirements of the approved checklists and standard plans as follows: within one (1) to three (3) business days for plans submitted at the public counter and electronic applications, or as soon thereafter as may be practicable.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

Do I need a permit for solar panels or an EV charger in Jurupa Valley?

Jurupa Valley's code: A permit issues for a complete application meeting the checklists and standard plans; counter or electronic submittal; 1 inspection. (Applies to small residential rooftop solar systems. Electronic signatures are accepted.) (§ 8.05.060); Expedited nondiscretionary permit when the charger meets state and federal safety rules; apply in person, mail or electronically. (Chargers with no specific, adverse public health or safety impact. Electronic signatures are accepted.) (§ 8.05.070).

General information, not legal advice.