Hemet · Building on your lot
Building on a hillside in Hemet
Hemet's own rules on building on a hillside, with the code text for every value.
Each rule below links to the section of the Hemet Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.
What Hemet's code says
| Grading and retaining walls |
|
|---|
Who this affects
Frequently asked questions
What extra rules apply to a hillside lot in Hemet?
Hemet's code: Graded slopes may be no steeper than 2:1 (50%). (Hillside development overlay zone; steeper only with a soils report and stabilization study.) (§ 90-941); Graded slopes may be no more than 30 feet high between terraces or benches. (Hillside development overlay zone.) (§ 90-941).
General information, not legal advice.
Ask about a specific Hemet property
Ask GoCodebook how Hemet's building on a hillside rules apply to your situation and get an answer that cites the section.
Ask your questionMore on building on your lot in Hemet
All building on your lot rules in Hemet
Fences and walls in Hemet
Sheds, garages and other accessory structures in Hemet
Running a business from home in Hemet
Solar panels and EV chargers in Hemet
Pets, chickens and bees in Hemet
Grading and erosion control in Hemet
Garage and yard sales in Hemet
Group homes and residential care in Hemet
Parking spaces required for homes in Hemet
Signs on homes in Hemet
Hemet Municipal Code — full text