Half Moon Bay · Building on your lot
Building on your lot in Half Moon Bay
Half Moon Bay sets its own size, height and setback rules for detached accessory structures. Small, low structures may stand in the required rear yard setback, and larger ones need greater setbacks.
Key points
- Rear yard sheds: In Half Moon Bay's rear yard setback, detached accessory structures are limited to 8 ft and 250 sq ft, 5 ft from lot lines.
- Larger structures: Larger Half Moon Bay accessory structures, over 250 sq ft and 12 ft, need 10-ft rear and 5-ft side setbacks.
Each rule below is marked Half Moon Bay code or CA state law and links to the section it comes from (checked October 2026). General information, not legal advice.
Sheds, garages and other accessory structures
| Maximum height |
|
|---|---|
| Size or lot coverage |
|
| Side and rear setback |
|
RV and boat parking
| Parking on the street |
|
|---|
Solar panels and EV chargers
| EV charger permit |
|
|---|---|
| Review time |
|
Other Half Moon Bay rules on this
Half Moon Bay's code also has these chapters. We have not summarized their values on this page yet; read them in the library.
- Draining a pool into the sewer (§ 13.20.170)
- Permit to remove or prune a heritage tree (Ch. 7.40)
Who this affects
Frequently asked questions
How big can a shed or accessory building be in Half Moon Bay?
In Half Moon Bay's rear yard setback, detached accessory structures are limited to 8 ft and 250 sq ft, 5 ft from lot lines. Larger Half Moon Bay accessory structures, over 250 sq ft and 12 ft, need 10-ft rear and 5-ft side setbacks.
Can I park an RV or boat at my home in Half Moon Bay?
Half Moon Bay's code: Not allowed between 2:00 a.m. and 5:00 a.m. (Oversize or nonmotorized vehicles on any public street or highway.) (§ 10.37.020); Not allowed on a public street once detached, except while loading, unloading or making emergency repairs. (Nonmotorized vehicles, such as trailers, detached from their motor vehicle.) (§ 10.37.030).
Do I need a permit for solar panels or an EV charger in Half Moon Bay?
Half Moon Bay's code: Nondiscretionary building permit issued on receipt of a complete application meeting the approved checklist and standard plan. (§ 14.70.060); Within 3 business days. (Complete application filed electronically.) (§ 14.60.060).
General information, not legal advice.
Ask about a specific Half Moon Bay property
Ask GoCodebook how these rules apply to your address and get an answer that cites the section.
Ask your question