California ADU rules · Monterey County

Can I Build an ADU in Greenfield?

Yes — you can build an ADU in Greenfield. California's statewide ADU law requires every city, including Greenfield, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.

Figures below reflect Greenfield's adopted ADU ordinance layered on California state law.

Can you build one?

ADUs allowed

Local rule

Conditional

Ministerial/by-right if all objective standards are met; discretionary review possible if not, with appeal rights.

§ 17.90.050

Units on a single-family lot

CA state law

1 ADU + 1 JADU

At least one ADU and one JADU per single-family lot (a conversion ADU may also be possible).

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Units on a multifamily lot

Local rule

conversions (>=1 or 25% of units) + up to 8 detached (not exceeding number of existing units); up to 2 detached on lot with proposed multifamily dwelling

Detached ADUs on multifamily lots capped at 8 and cannot exceed number of existing units; up to 2 detached on proposed multifamily lots.

§ 17.90.020(B), § 17.90.030(C)

Junior ADU (JADU)

CA state law

Allowed

Up to 500 sq ft, within the walls of an existing single-family home (single-family lots only).

Cal. Gov. Code § 66333 (junior ADUs)

Size & height

Max detached ADU size

Local rule

1,000 sq ft

Detached ADUs: 1,000 sq ft max if >1 bedroom; 850 sq ft if 1 bedroom or less.

§ 17.90.020(D)

Max attached ADU size

Local rule

1,000 sq ft max (>1 bedroom) or 850 sq ft (1 bedroom or less); cannot exceed 50% of primary, but 800 sq ft min and 1,000 sq ft max allowed

50% rule waived to allow up to 1,000 sq ft; 850/1,000 sq ft max depending on bedroom count.

§ 17.90.020(D)

Guaranteed minimum size

CA state law

800 sq ft

An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).

Cal. Gov. Code § 66321 (size minimums & height)

Max JADU size

CA state law

500 sq ft

Cal. Gov. Code § 66333 (junior ADUs)

Max height

Local rule

16 ft

16 ft standard; 18 ft if near transit or for multifamily/multistory; up to 20 ft to match roof pitch if near transit.

§ 17.90.020(H)

Setbacks

Side setback

CA state law

4 ft

A city cannot require more than 4 ft side or rear setback; conversions of existing structures are exempt.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Rear setback

CA state law

4 ft

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Front setback

CA state law

No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Separation from main house

Local rule

6 ft

Detached ADUs must be 6 ft from primary dwelling; 5 ft from eaves of habitable structure.

§ 17.90.020(F)(5), (7)

Parking

Parking required

Local rule

Up to 1 space

1 off-street space per ADU (none for studios); multiple exemptions apply.

§ 17.90.020(I)

Transit parking exemption

CA state law

Yes — no parking required near transit & for conversions

No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.

Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)

Garage-conversion replacement parking

Local rule

Not required

No replacement parking required when garage/carport/covered parking is converted.

§ 17.90.020(I)(4)(a)

Approval, timeline & cost

Approval path

CA state law

Ministerial (by right)

No public hearing or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Approval timeline

CA state law

60 days

The agency must act within 60 days of a complete application — and the ADU is deemed approved if it does not.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Owner-occupancy

Local rule

Only for a JADU

Owner-occupancy required for JADUs only; not required for ADUs.

§ 17.90.030(J)

Impact-fee waiver

CA state law

Waived under 750 sq ft

An ADU of 750 sq ft or less pays no impact fees (the 750 sq ft threshold itself is exempt under § 66311.5); larger ADUs pay fees proportional to the primary dwelling. JADUs (≤ 500 sq ft) are exempt.

Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Permits required

Local rule

Building permit, Deed restriction (JADU), Inspection (JADU)

JADUs require deed restriction and inspection in addition to building permit.

§ 17.90.040

Greenfield-specific factors that can change the answer

State law sets the floor, but these local conditions often decide whether a specific parcel works.

Fire sprinklers

Sprinklers not required for ADUs unless required for primary dwelling; required for ADUs in multifamily buildings with sprinklers.

Historic district

No parking required for ADUs in historic districts.

Greenfield caps detached and attached ADUs at 1,000 sq ft (850 sq ft for 1-bedroom or less), requires 6 ft separation from the primary dwelling, and mandates owner-occupancy only for JADUs. Up to 8 detached ADUs are allowed on multifamily lots, but not exceeding the number of existing units.

Frequently asked questions

Can I build an ADU in Greenfield?

Yes. California's statewide ADU law requires Greenfield to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.

How big can an ADU be in Greenfield?

A detached ADU of at least 1,000 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.

What are the setback requirements for an ADU in Greenfield?

Side and rear setbacks are limited to 4 ft. No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone.

Is parking required for an ADU in Greenfield?

Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.

How long does ADU approval take in Greenfield?

A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.

Do I have to live on the property to build an ADU in Greenfield?

Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.

Sources

  • Greenfield Municipal Code Chapter 17.90 (Ord. 574 Exh. A, 2025)
  • § 17.90.050
  • § 17.90.020(B), § 17.90.030(C)
  • § 17.90.020(D)
  • § 17.90.020(H)
  • § 17.90.020(F)(5), (7)
  • § 17.90.020(I)
  • § 17.90.020(I)(4)(a)
  • § 17.90.030(J)
  • § 17.90.040
  • § 17.90.020(N)
  • § 17.90.020(I)(4)(b)
  • Cal. Gov. Code §§ 66310–66342 (ADU Law)
  • HCD 2025 Accessory Dwelling Unit Handbook
  • Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
  • Cal. Gov. Code § 66333 (junior ADUs)
  • Cal. Gov. Code § 66321 (size minimums & height)
  • Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
  • Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
  • Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Last updated 2026-06-25. This is an AI-assisted summary of Greenfield's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Greenfield Planning before relying on it.

Will an ADU work on your Greenfield lot?

Ask GoCodebook about your address and get the size, setback, parking and permit rules that actually apply to your parcel — with the exact citation.

Check my parcel free

Related