Fort Jones · Building on your lot
Building in a flood zone in Fort Jones
Fort Jones's own rules on building in a flood zone, with the code text for every value.
Each rule below links to the section of the Fort Jones Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.
What Fort Jones's code says
| Floodplain permit |
|
|---|---|
| Height of the lowest floor |
|
Who this affects
Frequently asked questions
What are the rules for building in a Fort Jones flood zone?
Fort Jones's code: You need a development permit before building, filling, storing materials or adding drainage in any special flood hazard area. (§ 18.56.090); The lowest floor must be at or above the base flood elevation, or higher where the state building code requires. (New or substantially improved homes in A1-30, AE and AH zones.) (§ 18.56.190).
General information, not legal advice.
Ask about a specific Fort Jones property
Ask GoCodebook how Fort Jones's building in a flood zone rules apply to your situation and get an answer that cites the section.
Ask your question