Skip to content

Dinuba · Building on your lot

Garage and yard sales in Dinuba

Dinuba's own rules on garage and yard sales, with the code text for every value.

Each rule below links to the section of the Dinuba Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.

What Dinuba's code says

Dinuba code What Dinuba's code adds
Hours
  • A sale may not start before 6 a.m. or continue after 8 p.m.
    § 17.45.210 · code text
    No sale shall start before six a.m. or continue after eight p.m.
How long a sale may last
  • No more than 3 days per sale.
    § 17.45.210 · code text
    No sale shall last more than three days.
Permit
  • Every sale needs a permit; the first sale each calendar year has no fee, the second a council-set fee.
    Applies: Post the permit where it can be seen from the street.
    § 17.45.210 · code text
    1. First time during calendar year, permit required (no fee);
Sales per year
  • No more than 2 sales per calendar year.
    Applies: Per address; more sales only with a conditional use permit approved by the planning commission.
    § 17.45.210 · code text
    There shall not be more than two sales allowed per calendar year at any one address, unless a conditional use permit is filed and approved by the planning commission.
Signs
  • On-property signs only, during the sale; each at most 3 square feet, 9 square feet total; no blocking views.
    § 17.45.210 · code text
    Individual signs shall not exceed three square feet; total signs shall not exceed nine square feet in the aggregate, and shall not be placed so as to block vehicular or pedestrian view from adjoining properties.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

What are the garage sale rules in Dinuba?

Dinuba's code: No more than 2 sales per calendar year. (Per address; more sales only with a conditional use permit approved by the planning commission.) (§ 17.45.210); Every sale needs a permit; the first sale each calendar year has no fee, the second a council-set fee. (Post the permit where it can be seen from the street.) (§ 17.45.210).

General information, not legal advice.

Ask about a specific Dinuba property

Ask GoCodebook how Dinuba's garage and yard sales rules apply to your situation and get an answer that cites the section.

Ask your question

More on building on your lot in Dinuba