Del Mar · Building on your lot
Building on your lot in Del Mar
Del Mar sets when a small detached accessory building or a garage set into an embankment may skip yard rules. It also has a section on fences and retaining walls.
Key points
- Accessory buildings: One-story accessory buildings up to 500 square feet and 30 feet per side may occupy the rear yard, except in R1-40, R1-14 and R1-10.
- Fences: Del Mar regulates fences and retaining walls in Section 30.86.090 of its code.
Each rule below is marked Del Mar code or CA state law and links to the section it comes from (checked October 2026). General information, not legal advice.
Sheds, garages and other accessory structures
| Size or lot coverage |
|
|---|---|
| Side and rear setback |
|
Lot splits under SB 9
Del Mar code The 2 new lots must be about equal; neither may be smaller than 40% of the original lot area. New units may be no larger than 800 square feet.
All 9 Del Mar rules on lot splits under sb 9, with the code text and the state law underneath →
Solar panels and EV chargers
| EV charger permit |
|
|---|---|
| Solar permit process |
|
Tree removal
| Exemptions |
|
|---|
Swimming pools
Del Mar code The pool barrier must have no openings. The fence or wall must not offer ladder-like or step-like footholds for climbing.
All 11 Del Mar rules on swimming pools, with the code text and the state law underneath →
Other Del Mar rules on this
Del Mar's code also has these chapters. We have not summarized their values on this page yet; read them in the library.
- Fences and retaining walls (§ 30.86.090)
- Only household pets may be kept (§ 30.86.020)
Who this affects
Frequently asked questions
How tall can a fence be in Del Mar?
Del Mar regulates fences and retaining walls in Section 30.86.090 of its code. Del Mar also has a related rule: Fences and retaining walls (§ 30.86.090).
How big can a shed or accessory building be in Del Mar?
One-story accessory buildings up to 500 square feet and 30 feet per side may occupy the rear yard, except in R1-40, R1-14 and R1-10.
Do I need a permit for solar panels or an EV charger in Del Mar?
Del Mar's code: Administrative, nondiscretionary review; the Building Official issues permits when the application meets the checklist and applicable laws. (Applies to electric vehicle charging stations.) (§ 23.22.050); You may apply in person, by mail, or electronically, and must pay the permit processing and inspection fees. (Applies to electric vehicle charging station permit applications.) (§ 23.22.040).
Do I need a permit to remove a tree in Del Mar?
Del Mar's code: You must file a Notice of Intent with the Planning Director 2 working days before removal. (Applies to a protected tree that is exempt from the permit requirement.) (§ 23.50.040).
General information, not legal advice.