Sewer lateral inspection in Corte Madera
Corte Madera's own rules on sewer lateral inspection, with the code text for every value.
Each rule below links to the section of the Corte Madera Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.
What Corte Madera's code says
| Deadline to comply |
|
|---|---|
| Fee or permit |
|
| When an inspection is required |
|
| Owner's responsibility |
|
Who this affects
Frequently asked questions
Does Corte Madera require a sewer lateral inspection when you sell a home?
Corte Madera's code: Testing is required when an existing sewer lateral will serve a new building. (Applies to existing sewer laterals that serve a new building.) (§ 21.20.080); The owner has 180 days to finish the required repairs, at the owner's expense. (Starts when a notice to repair or replace is issued, based on defects in the sewer lateral inspection report.) (§ 21.22.040).
General information, not legal advice.