California ADU rules · Riverside County

Can I Build an ADU in Corona?

Yes — you can build an ADU in Corona. California's statewide ADU law requires every city, including Corona, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.

Figures below reflect Corona's adopted ADU ordinance layered on California state law.

Can you build one?

ADUs allowed

CA state law

Yes — by right

ADUs and JADUs are allowed by right in all residential and mixed-use zones; ministerial approval, no hearing.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Units on a single-family lot

Local rule

Maximum of two units in any combination: (1) one detached ADU + one JADU, (2) one detached ADU + one attached/internal ADU, or (3) two JADUs

Allows two JADUs or a detached ADU plus an attached/internal ADU, which is broader than the state baseline.

§ 17.85.030(K)(1)

Units on a multifamily lot

Local rule

Conversions: at least one ADU or JADU within existing non-livable space, up to 25% of existing units; Detached: up to 8 detached ADUs, not to exceed the number of existing units; Proposed multifamily: up to 2 detached ADUs

Detached ADUs on multifamily lots capped at the number of existing units; up to 2 detached ADUs for proposed multifamily.

§ 17.85.030(K)(2)-(3)

Junior ADU (JADU)

Local rule

Allowed

JADUs allowed within existing or proposed single-family dwellings.

§ 17.85.050(D)(2)

Size & height

Max detached ADU size

Local rule

1,200 sq ft

Local maximum is 1,200 sq ft; cannot preclude at least 800 sq ft.

§ 17.85.040(D), (E)

Max attached ADU size

Local rule

50% of primary, >=800

Attached ADU max is 50% of primary unit, but not less than 800 sq ft.

§ 17.85.040(D)

Guaranteed minimum size

CA state law

800 sq ft

An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).

Cal. Gov. Code § 66321 (size minimums & height)

Max JADU size

Local rule

500 sq ft

JADU maximum size is 500 sq ft.

§ 17.85.050(D)(2)

Max height

CA state law

16 ft

16 ft baseline; cities must allow 18 ft within ½ mi of a major transit stop or where the primary dwelling is two-story, and 20 ft on a lot with a multistory multifamily building.

Cal. Gov. Code § 66321 (size minimums & height)

Setbacks

Side setback

Local rule

4 ft

4 ft minimum for new construction; conversions may have zero setback.

§ 17.85.040(F)

Rear setback

Local rule

4 ft

4 ft minimum for new construction; conversions may have zero setback.

§ 17.85.040(F)

Front setback

Local rule

Must comply with underlying zone, except state law preempts for 800 sq ft ADUs

Front setback per base zone, but state preemption applies for 800 sq ft ADUs.

§ 17.85.040(F)

Separation from main house

CA state law

None required

No statewide separation requirement between the ADU and the primary dwelling.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Parking

Parking required

Local rule

Up to 1 space

1 space per unit or per bedroom (whichever is less) for new ADUs; no parking for conversions.

§ 17.85.040(B), (C)

Transit parking exemption

CA state law

Yes — no parking required near transit & for conversions

No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.

Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)

Garage-conversion replacement parking

Local rule

Not required

No replacement parking required when garage/carport/parking space is converted.

§ 17.85.040(B)(2)

Approval, timeline & cost

Approval path

CA state law

Ministerial (by right)

No public hearing or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Approval timeline

CA state law

60 days

The agency must act within 60 days of a complete application — and the ADU is deemed approved if it does not.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Owner-occupancy

Local rule

Only for a JADU

Owner occupancy required for JADUs only.

§ 17.85.050(B)

Impact-fee waiver

CA state law

Waived under 750 sq ft

An ADU of 750 sq ft or less pays no impact fees (the 750 sq ft threshold itself is exempt under § 66311.5); larger ADUs pay fees proportional to the primary dwelling. JADUs (≤ 500 sq ft) are exempt.

Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Permits required

Local rule

Building permit, Deed restriction for JADUs

JADUs require a deed restriction in addition to a building permit.

§ 17.85.050(D)

Corona-specific factors that can change the answer

State law sets the floor, but these local conditions often decide whether a specific parcel works.

Sprinkler requirement

ADU must have sprinklers if the primary unit requires them.

Historic district parking exemption

No additional parking required for ADUs in historic districts.

Corona allows up to two ADUs in flexible combinations on single-family lots, including two JADUs, and caps detached ADUs at 1,200 sq ft. Sprinklers are required for ADUs if the primary dwelling requires them.

Frequently asked questions

Can I build an ADU in Corona?

Yes. California's statewide ADU law requires Corona to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.

How big can an ADU be in Corona?

A detached ADU of at least 1,200 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.

What are the setback requirements for an ADU in Corona?

Side and rear setbacks are limited to 4 ft. Must comply with underlying zone, except state law preempts for 800 sq ft ADUs.

Is parking required for an ADU in Corona?

Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.

How long does ADU approval take in Corona?

A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.

Do I have to live on the property to build an ADU in Corona?

Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.

Sources

  • Corona Municipal Code Chapter 17.85 (Ord. 3410, 2025)
  • § 17.85.030(K)(1)
  • § 17.85.030(K)(2)-(3)
  • § 17.85.050(D)(2)
  • § 17.85.040(D), (E)
  • § 17.85.040(D)
  • § 17.85.040(F)
  • § 17.85.040(B), (C)
  • § 17.85.040(B)(2)
  • § 17.85.050(B)
  • § 17.85.050(D)
  • § 17.85.040(J)
  • § 17.85.040(C)(2)
  • Cal. Gov. Code §§ 66310–66342 (ADU Law)
  • HCD 2025 Accessory Dwelling Unit Handbook
  • Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
  • Cal. Gov. Code § 66321 (size minimums & height)
  • Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
  • Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
  • Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Last updated 2026-06-25. This is an AI-assisted summary of Corona's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Corona Planning before relying on it.