Solar panels and EV chargers in Coalinga

Coalinga's own rules on solar panels and EV chargers, with the code text for every value.

Each rule below links to the section of the Coalinga Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.

What Coalinga's code says

Coalinga code What Coalinga's code adds
EV charger permit
  • The Building Official approves and issues all needed permits when the application meets the City's checklist.
    Applies: EV charging stations that meet all laws and safety standards. The station may not be powered or used until the City approves.
    § 8-16.04 · code text
    A permit application that satisfies the information requirements in the City's adopted checklist shall be deemed complete and be promptly processed.
  • Electronic submittal is allowed.
    § 8-16.04 · code text
    Consistent with Government Code Section 65850.7, the Building Official shall allow for electronic submittal of permit applications covered by this chapter and associated supporting documentations.
Solar permit process
  • 1 building inspection; the fire department may do a separate inspection.
    Applies: Applies to small residential rooftop solar systems eligible for expedited review.
    § 8-15.06 · code text
    Only one inspection shall be required and performed by the Building Department for small residential rooftop solar energy systems eligible for expedited review.
Review time
  • The permit is issued the following business day.
    Applies: Small rooftop solar; complete over-the-counter applications that meet the checklist and standard plan.
    § 8-15.06 · code text
    The Building Department shall issue a permit or other nondiscretionary permit the following business day for over- the-counter applications which are deemed complete or within three (3) business days for electronic applications of receipt of a complete application and meets the requirements of the approved checklist and standard plan.
  • The permit is issued within 3 business days.
    Applies: Small rooftop solar; complete electronic applications that meet the checklist and standard plan.
    § 8-15.06 · code text
    The Building Department shall issue a permit or other nondiscretionary permit the following business day for over- the-counter applications which are deemed complete or within three (3) business days for electronic applications of receipt of a complete application and meets the requirements of the approved checklist and standard plan.
  • An inspection is scheduled within 2 business days of a request.
    Applies: Applies to small residential rooftop solar systems.
    § 8-15.06 · code text
    An inspection will be scheduled within two (2) business days of a request.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

Do I need a permit for solar panels or an EV charger in Coalinga?

Coalinga's code: 1 building inspection; the fire department may do a separate inspection. (Applies to small residential rooftop solar systems eligible for expedited review.) (§ 8-15.06); The Building Official approves and issues all needed permits when the application meets the City's checklist. (EV charging stations that meet all laws and safety standards. The station may not be powered or used until the City approves.) (§ 8-16.04).

General information, not legal advice.

Ask about a specific Coalinga property

Ask GoCodebook how Coalinga's solar panels and EV chargers rules apply to your situation and get an answer that cites the section.

Ask your question

More on building on your lot in Coalinga