California ADU rules · Fresno County

Can I Build an ADU in Clovis?

Yes — you can build an ADU in Clovis. California's statewide ADU law requires every city, including Clovis, to approve a qualifying accessory dwelling unit by right, plus a junior ADU (JADU) on a single-family lot. What varies city to city are the local specifics below.

Figures below reflect Clovis's adopted ADU ordinance layered on California state law.

Can you build one?

ADUs allowed

CA state law

Yes — by right

ADUs and JADUs are allowed by right in all residential and mixed-use zones; ministerial approval, no hearing.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Units on a single-family lot

Local rule

1 ADU + 1 JADU per lot

Explicitly stated in local code.

Clovis Municipal Code § 9.40.020(D)(1)

Units on a multifamily lot

Local rule

up to 2 detached ADUs, or conversions in non-livable space up to 25% of existing units

Local cap of 2 detached ADUs on multifamily lots; conversions in non-livable space up to 25% of units.

Clovis Municipal Code § 9.40.020(D)(1)

Junior ADU (JADU)

CA state law

Allowed

Up to 500 sq ft, within the walls of an existing single-family home (single-family lots only).

Cal. Gov. Code § 66333 (junior ADUs)

Size & height

Max detached ADU size

Local rule

1,200 sq ft

Local maximum for detached ADUs is 1,200 sq ft.

Clovis Municipal Code § 9.40.020(D)(2), (D)(5)

Max attached ADU size

Local rule

50% of primary dwelling or 1,200 sq ft, whichever is greater

Attached ADUs may be larger than 1,200 sq ft if 50% of primary exceeds that.

Clovis Municipal Code § 9.40.020(D)(2)

Guaranteed minimum size

CA state law

800 sq ft

An 800 sq ft ADU must be allowed regardless of FAR/lot-coverage caps; a city also cannot cap an attached ADU below 850 sq ft (1,000 for 2+ bedrooms).

Cal. Gov. Code § 66321 (size minimums & height)

Max JADU size

CA state law

500 sq ft

Cal. Gov. Code § 66333 (junior ADUs)

Max height

CA state law

16 ft

16 ft baseline; cities must allow 18 ft within ½ mi of a major transit stop or where the primary dwelling is two-story, and 20 ft on a lot with a multistory multifamily building.

Cal. Gov. Code § 66321 (size minimums & height)

Setbacks

Side setback

CA state law

4 ft

A city cannot require more than 4 ft side or rear setback; conversions of existing structures are exempt.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Rear setback

CA state law

4 ft

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Front setback

CA state law

No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Separation from main house

CA state law

None required

No statewide separation requirement between the ADU and the primary dwelling.

Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)

Parking

Parking required

Local rule

Up to 1 space

1 per ADU unless exempt; no additional parking for JADUs.

Clovis Municipal Code § 9.40.020(D)(4)(e)

Transit parking exemption

CA state law

Yes — no parking required near transit & for conversions

No parking may be required within ½ mi walking distance of transit, in a historic district, for an ADU within an existing structure, within one block of car-share, or in certain permit-parking areas.

Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)

Garage-conversion replacement parking

CA state law

Not required

When a garage/carport is demolished or converted to build an ADU, replacement parking cannot be required.

Cal. Gov. Code § 66314 (local ordinance standards)

Approval, timeline & cost

Approval path

CA state law

Ministerial (by right)

No public hearing or discretionary design review for a qualifying ADU.

Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)

Approval timeline

Local rule

60 days

60-day ministerial review timeline.

Clovis Municipal Code § 9.40.020(G)(3), (H)

Owner-occupancy

Local rule

Only for a JADU

Owner-occupancy required only for JADUs.

Clovis Municipal Code § 9.40.020(H); Gov. Code § 65852.22

Impact-fee waiver

CA state law

Waived under 750 sq ft

An ADU of 750 sq ft or less pays no impact fees (the 750 sq ft threshold itself is exempt under § 66311.5); larger ADUs pay fees proportional to the primary dwelling. JADUs (≤ 500 sq ft) are exempt.

Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Permits required

Local rule

Building permit

Building permit required for all ADUs/JADUs.

Clovis Municipal Code § 9.40.020(F)(1)

Clovis-specific factors that can change the answer

State law sets the floor, but these local conditions often decide whether a specific parcel works.

Sprinkler requirement

ADUs/JADUs require sprinklers if the primary residence does.

Clovis limits multifamily lots to 2 detached ADUs and allows attached ADUs to exceed 1,200 sq ft if 50% of the primary dwelling is larger. Height limits are 16 ft for detached ADUs, with 18 ft allowed near transit or on multifamily/multistory lots.

Frequently asked questions

Can I build an ADU in Clovis?

Yes. California's statewide ADU law requires Clovis to approve a qualifying accessory dwelling unit ministerial (by right), plus a junior ADU (JADU) on a single-family lot.

How big can an ADU be in Clovis?

A detached ADU of at least 1,200 sq ft must be allowed, and an ADU of 800 sq ft can never be zoned out by floor-area or lot-coverage limits. A JADU can be up to 500 sq ft.

What are the setback requirements for an ADU in Clovis?

Side and rear setbacks are limited to 4 ft. No front setback may block the mandatory 800 sq ft / 16-ft / 4-ft-setback ADU; otherwise per base zone.

Is parking required for an ADU in Clovis?

Up to 1 space. No parking can be required within ½ mile of transit, for conversions, or for units inside the primary home. When a garage is converted, replacement parking is not required.

How long does ADU approval take in Clovis?

A complete application must be acted on within 60 days, with ministerial (by right) — no public hearing or discretionary design review for a qualifying ADU.

Do I have to live on the property to build an ADU in Clovis?

Owner-occupancy: only for a jadu. ADUs under 750 sq ft are also exempt from impact fees.

Sources

  • Clovis Municipal Code § 9.40.020 (Ord. 23-05, effective Aug. 9, 2023)
  • Clovis Municipal Code § 9.40.020(D)(1)
  • Clovis Municipal Code § 9.40.020(D)(2), (D)(5)
  • Clovis Municipal Code § 9.40.020(D)(2)
  • Clovis Municipal Code § 9.40.020(D)(4)(e)
  • Clovis Municipal Code § 9.40.020(G)(3), (H)
  • Clovis Municipal Code § 9.40.020(H); Gov. Code § 65852.22
  • Clovis Municipal Code § 9.40.020(F)(1)
  • Clovis Municipal Code § 9.40.020(D)(4)(g)
  • Cal. Gov. Code §§ 66310–66342 (ADU Law)
  • HCD 2025 Accessory Dwelling Unit Handbook
  • Cal. Gov. Code § 66317 (ministerial approval, 60-day deadline)
  • Cal. Gov. Code § 66333 (junior ADUs)
  • Cal. Gov. Code § 66321 (size minimums & height)
  • Cal. Gov. Code § 66323 (by-right ADU/JADU, 800 sq ft, 4-ft setbacks)
  • Cal. Gov. Code § 66322 (ADU parking; § 66334 covers JADU parking)
  • Cal. Gov. Code § 66314 (local ordinance standards)
  • Cal. Gov. Code § 66311.5 (impact fees: none for an ADU ≤ 750 sq ft or JADU ≤ 500 sq ft)

Last updated 2026-06-25. This is an AI-assisted summary of Clovis's ADU rules, drawn from its published ordinance and California ADU law — general information, not legal advice, and it may be incomplete or out of date. Verify the controlling rule for your specific parcel with Clovis Planning before relying on it.