Brisbane · Building on your lot
Grading and erosion control in Brisbane
Brisbane's own rules on grading and erosion control, with the code text for every value.
Each rule below links to the section of the Brisbane Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.
What Brisbane's code says
| Grading without a permit |
|
|---|---|
| Rainy-season limits |
|
Who this affects
Frequently asked questions
What are the grading rules in Brisbane?
Brisbane's code: No permit: digging 5 cubic yards or less per site, under 2 feet deep, with no cut slope over 2:1. (Sections 15.01.340 and 15.01.350 still apply.) (§ 15.01.140); Grading in the wet season is not allowed unless the city engineer gives permission. (Applies to any grading during the wet season.) (§ 15.01.450).
General information, not legal advice.
Ask about a specific Brisbane property
Ask GoCodebook how Brisbane's grading and erosion control rules apply to your situation and get an answer that cites the section.
Ask your questionMore on building on your lot in Brisbane
All building on your lot rules in Brisbane
Fences and walls in Brisbane
Sheds, garages and other accessory structures in Brisbane
Lot splits under SB 9 in Brisbane
Solar panels and EV chargers in Brisbane
Noise and construction hours in Brisbane
Outdoor lighting in Brisbane
Affordable units in new housing (inclusionary) in Brisbane
Trash and recycling carts in Brisbane
Brisbane Municipal Code — full text