Skip to content

Bellflower · Building on your lot

Solar panels and EV chargers in Bellflower

Bellflower's own rules on solar panels and EV chargers, with the code text for every value.

Each rule below links to the section of the Bellflower Municipal Code it was read from, with the code text one click away (checked October 2026). General information, not legal advice.

What Bellflower's code says

Bellflower code What Bellflower's code adds
EV charger permit
  • The application may be sent by e-mail or delivered to the Building Official.
    § 15.72.050 · code text
    The Building Official, or designee, will adopt a checklist of all requirements with which the charging stations must comply to be eligible for expedited review.
  • The Building Official must approve an application that meets the checklist and standards; decision within 30 days.
    Applies: Counted from a complete application; applies if the station has no specific, adverse impact on public health or safety.
    § 15.72.060 · code text
    The Building Official must notify an applicant whether the application has been approved, or, alternatively, whether the applicant must obtain an Electric Vehicle Charging Station Use Permit, within 30 days after the submission of a complete application.
Solar permit process
  • Review covers only the checklist and California Building Standards Code; usually one combined inspection.
    Applies: Applies to small rooftop home solar systems.
    § 15.68.040 · code text
    Review of an application shall be limited to the Building Official's review of whether the application meets the checklist and California Building Standards Code requirements. However, if the Building Official makes a finding, based on substantial evidence, that the solar energy system could have a specific, adverse impact upon the public health and safety, the applicant may be required to apply for a "use" permit.

Who this affects

HomeownersContractorsDesigners

Frequently asked questions

Do I need a permit for solar panels or an EV charger in Bellflower?

Bellflower's code: Review covers only the checklist and California Building Standards Code; usually one combined inspection. (Applies to small rooftop home solar systems.) (§ 15.68.040); The application may be sent by e-mail or delivered to the Building Official. (§ 15.72.050).

General information, not legal advice.