Earlier editions: 2026-09
Chapter 26 — ZONING›Article VIII — SUBDIVISION REGULATIONS
West Covina Municipal Code § 26-337 Multiple final maps
West Covina Municipal Code · 2026-10 edition · updated 2026-10-04 · West Covina
Cite as: West Covina Municipal Code § 26-337 · Text as of 2026-10-04
Sec. 26-331. - Processing fee.¶
The fee for processing a final map shall be as established from time to time by resolution of the City Council. In addition, the fee for checking the final map shall be as established by the agency performing the checking; and such fee shall be paid directly to that agency.
(Ord. No. 2519, § 5(Exh. A), 2-20-24)
Sec. 26-332. - Additional survey requirements.¶
The required survey for a final map shall be a field survey made in conformity with the Land Surveyors' Act done within one (1) year preceding the approval of the final map. A closure shall be done on the survey, and a copy of the closure shall be provided the City Engineer and the agency checking the final map.
(Ord. No. 2519, § 5(Exh. A), 2-20-24)
Sec. 26-333. - Additional map requirements.¶
Upon recordation of the final map, a reproducible copy of the map on mylar or other material approved by the City Engineer and one (1) blueline or blackline print shall be filed with the City Engineer. The copy and print shall have the recorder's stamp and recording information clearly shown thereon.
(Ord. No. 2519, § 5(Exh. A), 2-20-24)
Sec. 26-334. - Additional certification and acknowledgements.¶
The final map shall contain a certificate for execution by the City treasurer stating that any and all special assessments, if any, levied against land included in the map have been paid in full.
(Ord. No. 2519, § 5(Exh. A), 2-20-24)
Sec. 26-335. - Additional monuments.¶
Monuments for final maps shall be set, found or reset at all angle points and beginnings and ends of curves on the exterior boundary of the subdivision; at all angle points and beginnings and ends of curves on the exterior boundaries of any and all land dedicated or offered for dedication for parks or open spaces; and on the center line of all interior and exterior streets at intersections, tract boundaries, the beginnings and ends of curves, angle points, and the radius center of cul-de-sac.
(Ord. No. 2519, § 5(Exh. A), 2-20-24)
Sec. 26-336. - Center line ties.¶
The engineer or surveyor under whose supervision center line monuments have been set, found or reset shall file with the City Engineer a set of notes and corner records, conforming to the size and quality of the City Engineer's standardized office records, showing clearly the ties between each monument and at least four (4) durable, distinctive reference points or monuments subject to the approval of the City Engineer.
(Ord. No. 2519, § 5(Exh. A), 2-20-24)
Sec. 26-337. - Multiple final maps.¶
In the event of the filing of multiple final maps relating to an approved or conditionally approved tentative map, the following conditions shall apply:
(a) The map shall be submitted to the Planning Commission for review and conditioning as the commission may find warranted to provide adequate traffic circulation, proportional development of any open spaces, proportional dedication of any parks, adequate drainage facilities, adequate fire protection, adequate water facilities and adequate sewerage facilities.
(b) The final map may be required to include the construction of improvements and dedications outside the boundaries of the final map but inside the boundaries of the tentative map.
(Ord. No. 2519, § 5(Exh. A), 2-20-24)
Get a plain-English answer with a citation back to this text.
Ask AI about this code