Earlier editions: 2026-07
Title 16 — Buildings and Construction›Division II — Grading and Excavation Code
Stanton Municipal Code Ch. 16.64 Completion of Work
Stanton Municipal Code · 2026-10 edition · updated 2026-10-04 · Stanton
Cite as: Stanton Municipal Code Chapter 16.64 · Text as of 2026-10-04
§ 16.64.010. Final reports.¶
Upon completion of the rough grading work and at the final completion of the work, the director may require the written approvals, reports, drawings and supplements thereto specified in subarticle 15 of the grading manual.
(Ord. § 15 (Exh. A), 1999)
§ 16.64.011. Notification of completion.¶
The permittee or his agent shall notify the director when the grading operation is ready for final inspection. All work including installation of all drainage facilities and their protective devices and all erosion control measures must be completed in accordance with the final approved grading plan and the required reports approved by the director before final approval of the grading permit is given by the director. He may approve the grading work prior to completion of all work in special cases of extreme hardship and if no hazard exists and an adequate bond is posted to assure completion of all remaining work.
(Ord. § 15 (Exh. A), 1999)
Get a plain-English answer with a citation back to this text.
Ask AI about this code