Chapter 14.35
San Jose Zoning Code · 2026-06 edition · ingested 2026-07-07 · San Jose
DIRIDON STATION AREA BASIC INFRASTRUCTURE FEE REQUIREMENTS
Sections:
14.35.010 Purpose and findings. ¶
14.35.020 Definitions. ¶
14.35.030 Application of chapter.
14.35.040 Infrastructure impact fee requirement.
14.35.050 Accounting of Diridon Station area basic infrastructure impact fee.
14.35.060 Expiration of Diridon Station area basic infrastructure impact fee.
14.35.010 Purpose and findings. ¶
On June 17, 2014, the City Council adopted the Diridon Station Area Plan (Resolution No. 77098) establishing long-term goals for the Diridon Station Area, including a land use plan, urban design guidelines, a framework for station expansion, transportation and parking strategies, housing strategies, and an art master plan. The plan integrates open space, transportation and land uses to create an expansion of Downtown San José. Implementa-
T14:135
SAN JOSÉ CODE
§ 14.35.010
tion of the Diridon Station Area Plan requires the construction of vital basic infrastructure systems to support private development.
On December 18, 2018, the City Council adopted the Downtown Strategy 2040 Plan (Resolution No. 78944) to guide the development and redevelopment of the Downtown area through the year 2040, including the Diridon Station Plan area and Downtown Growth Areas consistent with the General Plan Major Strategies, Goals, and Policies. In implementing the Downtown Strategy 2040, the City will continue to intensify Downtown with mixed uses and public infrastructure, strengthening it as a regional employment center, entertainment destination, and significant hub for public life.
The City completed a Nexus Study in May 2019 for a new Diridon Station Basic Infrastructure Impact Fee to facilitate development in the Diridon Station Area and create a funding mechanism to help fund the future construction of vital public infrastructure. The Nexus Study provided the City with the technical analysis that established a reasonable relationship between: 1) new development in the Diridon Station Area and the need for and use of impact fees; and 2) the cost of new infrastructure and facilities and the amount of the fee charged to each development project. The Nexus Study quantified the connection between planned development in and around the Diridon Station Area and needed infrastructure or facilities in the categories of transportation (streets), plaza/non-park open space, sanitary sewer, and storm drainage and flood control.
It is the intent and purpose of the City Council in adopting this Chapter to provide in part for the basic Diridon Station Area public infrastructures through the adoption of a Diridon Station Area Basic Infrastructure Impact Fee to be charged to all new development in the manner specified herein. (Ord. 30305.)
14.35.020 Definitions. ¶
The definitions set forth in this section shall govern the application and interpretation of this Chapter:
A. "Diridon Station Area Basic Infrastructure Impact Fee" means the fee adopted by the City Council pursuant to this Chapter.
B. "Diridon Station Area Impact Fee Zone" means that project area of approximately 250 acres within the corporate limits of the City of San José generally bounded by the Guadalupe River and Delmas Avenue to the east, Interstate 280 to the south, Sunol Avenue and the Caltrain railroad right-of-way to the west and Lenzen Avenue and the Union Pacific railroad right-of-way to the north, as specified and depicted in the Nexus Study including the additional area bounded by the Guadalupe River on the east, West Santa Clara Street on the north, West San Fernando Street on the south and South Autumn Street on the west, as may be amended.
C. "Diridon Station Area: Impact Fee Nexus Study for Basic Infrastructure" or "Nexus Study" is the fee study dated May 2019 as presented to the City Council on August 20, 2019, as may be amended. The Nexus Study calculates the maximum fee the City may charge on new development to fund certain basic infrastructure and facilities in the Diridon Station Area Impact Fee Zone. The Nexus Study established a reasonable relationship or connection between the development project, the fee that is charged, and the infrastructure or facilities funded by the fee. The Diridon Station Area: Impact Fee Nexus Study for Basic Infrastructure is maintained for public review in the Departments of Public Works.
(Ord. 30305.)
T14:136
PUBLIC WORKS AND IMPROVEMENTS
§ 14.35.060
14.35.030 Application of chapter. ¶
This Chapter establishes the requirements for the Diridon Station Area Basic Infrastructure Impact Fee for all new development and infrastructure in the Diridon Station Area Impact Fee Zone. The Diridon Station Area Basic Infrastructure Impact Fee is to provide funding in the amounts and for those improvements specified in the Diridon Station Area: Impact Fee Nexus Study for Basic Infrastructure. Nothing in this Chapter shall restrict the ability of the City to require dedication of land, payment of fees or construction of improvements for needs other than, or in addition to, the improvements specified in the Diridon Station Area: Impact Fee Nexus Study for Basic Infrastructure. (Ord. 30305.)
14.35.040 Infrastructure impact fee requirement. ¶
- A. Prior to the issuance of any building permit for new development in the Diridon Station Area Impact Fee Zone, the Diridon Station Area Basic Infrastructure Impact Fee shall be paid pursuant to the prototype and infrastructure category, as calculated in the Diridon Station Area: Impact Fee Nexus Study for Basic Infrastructure, or as amended by City Council resolution.
alent. The Diridon Station Area Impact Fee Fund, including accrued interest, shall be subject to the all of the applicable provisions of Government Code section 66000 et seq ., including but not limited to the requirements for accounting, reporting and expenditure of the fund for the improvements specified in the Diridon Station Area: Impact Fee Nexus Study for Basic Infrastructure. (Ord. 30305.)
14.35.060 Expiration of Diridon Station area basic infrastructure impact fee. ¶
All Diridon Station Area Basic Infrastructure Impact Fees shall be collected until the improvements specified in the Diridon Station Area: Impact Fee Nexus Study for Basic Infrastructure are fully funded and constructed. In the event that public or private funds are advanced to accelerate the construction of the improvements specified in the Diridon Station Area: Impact Fee Nexus Study for Basic Infrastructure, the Diridon Station Area Basic Infrastructure Impact Fees shall be collected until all advanced public or private funding is fully reimbursed or credited to entity that provided advanced funding.
(Ord. 30305.)
B. The Diridon Station Area Basic Infrastructure Impact Fee specified in subsection A above shall be increased by the Engineering NewsRecord (ENR) Construction Cost Index for San Francisco Urban area published by McGraw Hill on January 1 of every year.
C. No building permit shall be issued for construction within the Diridon Station Area Impact Fee Zone unless and until the Diridon Station Area Basic Infrastructure Impact Fee has been paid in full.
(Ord. 30305.)
14.35.050 Accounting of Diridon Station area basic infrastructure impact fee. ¶
All Diridon Station Area Basic Infrastructure Impact Fee shall be deposited into the designated Diridon Station Area Impact Fee Fund or its equiv-
T14:137
SAN JOSÉ
MUNICIPAL CODE
VOLUME III
2024
==> picture [301 x 130] intentionally omitted <==