Ojai Municipal Code § 10-2.1903 Applicability
Ojai Municipal Code · 2026-10 edition · updated 2026-10-04 · Ojai
Cite as: Ojai Municipal Code § 10-2.1903 · Text as of 2026-10-04
§ 10-2.1901. Purpose of article.¶
The purpose of this article is to ensure that any construction or initiation or re-establishment of a legallyallowed use within a legally established (or a legal nonconforming) structure shall comply with these Zoning Regulations and all applicable provisions of the Municipal Code.
(§ 3, Ord. 771, eff. February 13, 2004)
§ 10-2.1902. Application.¶
(a) The following shall not take place until a nondiscretionary zoning clearance has first been issued by the Director:
(1) Structure(s) shall not be erected (new or remodeled);
(2) Altered, repaired, vacant, or hereafter erected structure(s) shall not be occupied; or
(3) Change(s) in use of land or structure(s) shall not be inaugurated.
(b) An application for the clearance shall be filed with the Department in compliance with Section 10-2.1805
(§ 3, Ord. 771, eff. February 13, 2004)
§ 10-2.1903. Applicability.¶
A zoning clearance shall be required for:
(a) A clearance for a structure which is to be erected or remodeled shall be filed in conjunction with the companion building permit application.
(b) A clearance for the use of vacant non-residential land or structure(s) shall be filed at least 14 days before the intended use inauguration.
(c) In order to provide for an expeditious development permit review/reconstruction process, which may only be available following the occurrence of a bona fide emergency (e.g., natural disaster), as determined by the Council, an emergency building permit and temporary zoning clearance may be issued by the appropriate City departments with adequate deposits/security required by subsection (d) of this section.
(d) A temporary zoning clearance may be issued by the Director allowing almost "immediate" construction or use of the structures, subject to the conditions imposed on the use, provided that a deposit/security is filed with the Department before the issuance of the temporary clearance. The deposit/security shall guarantee the faithful performance and completion of all terms, conditions, and performance standards imposed on the proposed structure or use. The form of the deposit/security shall be subject to the approval of the Director. The deposit/security shall be processed for return to the depositor following a determination by the Director that all of the terms, conditions and performance standards have been met and permanent occupancy has been granted.
(e) A zoning clearance for a new fence, wall or screening or replacement of a fence, wall, or screening pursuant to the standards within Sections 10-2.803 (Height measurement and exceptions), 10-2.804 (Setback measurement and exceptions), and 10-2.805 (Fences, walls, hedges. and screening).
(§ 3, Ord. 771, eff. February 13, 2004, as amended by § 4, Ord. 910, eff. December 10, 2020)
§ 10-2.1904. Applicable regulations.¶
All applications shall be subject to the applicable provisions of these Zoning Regulations, including the procedures identified in the following: Section 10-2.1805, Application Filing; Article 30, Appeals.
(§ 3, Ord. 771, eff. February 13, 2004)