Skip to content

Division 94

SEC. 91.9405. PRE-DESIGN INVESTIGATION.

Los Angeles Building Code — LAMC Chapter IX · 2026-08 edition · updated 2026-09-09 · Los Angeles

(Added by Ord. No. 171,258, Eff. 8/30/96.)

The engineer or architect shall prepare a pre-design field investigation report in accordance with Department guidelines and shall file the report when the plans are filed for permit. The plans shall include a description of the existing lateral force resisting system at and below the base.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Los Angeles Building Code — LAMC Chapter IX

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.